My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-089B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-089B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:22:05 PM
Creation date
8/6/2019 3:02:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/11/2019
Control Number
2019-089B
Agenda Item Number
8.E.
Entity Name
Kimley Horn and Associates
Subject
Bulk Acid Tank Replacement at North (Hobart) County Water Plant
Area
North (Hobart) County Water Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will answer questions from contractors regarding the scope of work during the <br />price proposal phase. Consultant will review one set of shop drawings on the tank and <br />piping during the construction phase of the project. <br />TIME SCHEDULE <br />Services for Tasks 1 through 3 are anticipated to be completed within 3 weeks of notice <br />to proceed. Task 4 will be concurrent with project construction and is anticipated to be <br />completed within 6-8 months, depending on contractor's schedule. <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting <br />Engineering Services Agreement for Professional Services dated April 17th, 2018, by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task No. <br />Task <br />Task Fee <br />Task 1 <br />Review Existing Conditions, Phasing Plan <br />$ 3,300 <br />Task 2 <br />Design Plans and Specifications <br />$ 14,360 <br />Task 3 <br />Coordination <br />$ 4,050 <br />TOTAL LUMP SUM FEE <br />$ 21,710 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but may <br />be required depending on circumstances that may arise during the execution of this <br />project. Additional services include, but may not be limited to the following: <br />• Construction phase services (beyond those described in Task 3) are not <br />included under this task order, but can be prepared if needed after bidding. <br />• Permitting, including preparation of permit application and supporting <br />information is not believed to be necessary, and therefore not provided. Tank <br />replacement is strictly considered maintenance. <br />K:\WPB_Civil\044572048 - South RO Plant Improvements\Scope\20190708 Hobart Acid Tank Scope.docx Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.