My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/09/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/09/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:35:57 PM
Creation date
8/7/2019 1:29:42 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/09/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
landscaping requirements shall apply, and alternative requirements (such as <br />fencing) may be required. <br />NOTE: The project site is located within the RS -6 district. Therefore, this subsection does <br />not apply. <br />All conditions recommended by staff have been accepted by the applicant. <br />RECOMMENDATION <br />Staff recommends that the BCC grant conceptual site plan and special exception use approval for the <br />school facility, with the following conditions: <br />1. The final site plan and associated County permits shall include the final design of the following: <br />a. Tree protection and tree mitigation plan; <br />b. Landscape plan; <br />c. Left and right turn lanes at both project driveway connections (27th Avenue and 4th <br />Street); <br />d. Stormwater management system that will accommodate runoff generated by the offsite <br />left and right turn lanes; <br />e. 27th Avenue sidewalk; <br />f. Internal sidewalk/pedestrian system; and <br />g. Streetlighting plan. <br />2. The maximum student enrollment shall not exceed 400 students. <br />3. The multi-purpose playfield shall not include outdoor lighting. Any future request to add <br />outdoor lighting to the playfield area will require special exception approval (PZC review and <br />BCC approval). <br />4. Prior to issuance of a Certificate of Occupancy (C.O.) for Phase 1, the required left and right <br />turn lanes at both project driveway connections (27th Avenue and 4th Street) shall be completed. <br />ATTACHMENTS <br />1. Excerpt from Draft June 13, 2019 PZC Minutes <br />2. Location Map <br />3. Aerial <br />4. Conceptual Site Plan <br />119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.