My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-109A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-109A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:54:52 PM
Creation date
8/28/2019 3:02:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/16/2019
Control Number
2019-109A
Agenda Item Number
12.G.4.
Entity Name
National Metering services, Inc.
Subject
Agreement of Meter Deployment Services
AMR-Automatic Meter Reading
Area
SWDD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 5. METER DEPLOYMENT PLAN <br />5.01 General. <br />(1) National shall provide the Services and Documents for the deployment and <br />installation of AMR Meters (the "Deployment") in accordance with the <br />deployment and installation plan (the "Deployment Plan") as described in <br />Section 5.02. <br />(2) IRC shall perform the IRC Responsibilities in accordance with the Deployment <br />Plan. <br />5.02 Contents of Deployment Plan. The Deployment Plan shall, as a minimum, include the <br />following information: <br />(1) <br />a detailed description of the strategy, approach and activities that National will <br />undertake to deploy, install and test the AMR Meters, including specifics as to <br />(a) mapping and scheduling; (b) route saturation, route acceptance, route <br />commissioning and AMR Meter commissioning; (c) accommodating IRC <br />constraints (e.g., labor constraints, operations schedules and plans, scheduled <br />meter readings (blackout periods) and planned outages); (d) identifying AMR <br />Meter inventories required to support deployment/installation schedules and <br />coordinating with IRC personel on purchases; (e) warehousing of AMR Meters <br />(including quarantine procedures), transporting IRC accepted AMR Meters to <br />warehouse, and returning Rejected Meters to AMR Meter supplier(s) for <br />replacement; allocation of warehouse by service territory administrative regions <br />(including details regarding start-up, duration of operation, close-out and <br />relocation of cross -docks); (f) transportation of AMR Meters and fleet <br />management; (g) work order management (e.g., National's methodology to <br />manage individual customer installations from a scheduling, completion and <br />close out perspective); (h) transfer or hand-off of responsibility for AMR Meters <br />from the manufacturer/vendor to National; (i) meter asset tracking (e.g., <br />inventory control procedures) of AMR Meters, including use of barcodes ; 0) <br />quality assurance and quality control procedures to ensure that employees are <br />adequately trained to follow procedures, and perform accurate and quality <br />installations; (k) removal and disposal of Replaced Meters, including temporary <br />storage and transfer of such Replaced Meters to disposal sites; (I) procedures for <br />the handoff of non -accessible meters to IRC (m) performance of On -Site Repairs <br />and removal and re -installation, or installation, of lock rings; (n) National's <br />proposed management and administration of the Deployment, including <br />National's organization structure, National's procedures for <br />interfacing/interaction with IRC's AMR field deployment organization, National's <br />procedures for ensuring coordination, maintaining up-to-date operating plans, <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.