My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-129
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:03:05 PM
Creation date
9/9/2019 1:15:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/13/2019
Control Number
2019-129
Agenda Item Number
8.I.I.
Entity Name
APTIM Environmental & Infrastructure
Subject
Sector 3 (Wabasso Beach) Beach and Dune Renourishment reconnaissance survey
Bid Number
work order no. 2018006-6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,`APTIM <br />August 1, 2019 <br />Page 2 of 5 <br />and can produce georeferenced HTML's viewable in generic web -browser software programs. SonarWiz also <br />produces digital geographic information for sidescan data that are exportable for incorporation into a GIS <br />database. <br />Nearshore Hardbottom: The nearshore hard bottom edge will be mapped using sidescan sonar between R-19 <br />and R-58. This includes 300 m updrift and 900 m downdrift of the proposed project area (R-20 to R-55). The <br />sidescan sonar survey will also include the area within 250 m offshore of the beach. <br />Pipeline Corridors: The sidescan sonar survey will encompass the area within the pipeline corridor plus the <br />area within 25 m to the left and right of each corridor. <br />Borrow Area: The sidescan sonar survey will encompass the area within 400 m of the proposed borrow area. <br />Task 1 Deliverable <br />A letter report describing equipment and operations, together with sidescan sonar mosaic maps with digitized <br />interpretations, will be produced for this task. In addition, georeferenced GeoTIFF mosaic files, as well as GIS <br />shapefiles will be exported and included as digital appendices to the letter report. <br />Task 1 Schedule <br />The sidescan sonar survey will commence within four (4) weeks of receipt of a Notice to Proceed from the County. <br />It will take approximately one week to mobilize and collect the sidescan sonar data, followed by another two <br />weeks of data processing, interpretation, and deliverable development. <br />Task 1 Cost <br />The lump sum cost for this task is $42,216.50. <br />Task 2: In situ Diver Verification and Assessment of Hardbottom Resources <br />Task 2: Scope of Work <br />The results from the sidescan sonar survey described in Task 2 will guide the in situ diver investigation of <br />hardbottom resources identified in the nearshore, within the pipeline corridors and adjacent to the borrow area. <br />Nearshore Hardbottom: Divers will verify the location and distribution of nearshore hardbottom resources <br />identified from the sidescan sonar survey described in Task 1. If small areas of edge mapping are needed due <br />to data gaps in the sidescan sonar data, divers will use a buoy with a Differential Global Positioning System <br />(DGPS) antenna linked to a topside laptop running HYPACK navigational software to delineate the hardbottom <br />edge. The buoy will be towed by divers along the reef edge to record the position of the divers during the <br />su rvey. <br />FDEP acknowledged in their request for additional information (RAI) #1 (0285993 -009 -JC - dated April 4, 2019) <br />that a sizeable amount of information has been collected on hardbottom resources adjacent to the proposed <br />fill template for the previous Sector 3 Beach Restoration project, and agrees that these data were collected <br />recently enough that they provide information on the status of the natural hardbottom community in this <br />area. Therefore, additional characterization of the nearshore hardbottom area is not proposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.