Laserfiche WebLink
AAPTIM <br />August 1, 2019 <br />Page 3 of 5 <br />Pipeline Corridors: Once the sidescan sonar survey is complete and the data has been interpreted to identify <br />hardbottom resources, the habitat within each proposed corridor will be verified in situ by divers. During each <br />investigation, divers shall determine the presence or absence of hardbottom resources and, if present, note <br />the general condition of the benthic community, identify dominant benthic organisms and substratum types, <br />and estimate the vertical relief of the hardbottom. Video and/or photographs shall be taken to document the <br />findings. Locations verified as areas with hardbottom resources shall be mapped in situ to document the <br />current distribution of hardbottom resources within the pipeline corridors. <br />Borrow Area: Once the sidescan sonar survey is complete and the data has been interpreted to identify <br />hardbottom resources, the habitat will be verified in situ by divers. During each investigation, divers shall <br />determine the presence or absence of hardbottom resources and, if present, note the general condition of <br />the benthic community, identify dominant benthic organisms and substratum types, and estimate the vertical <br />relief of the hardbottom. Video and/or photographs shall be taken to document the findings. Locations <br />verified as areas with hardbottom resources shall be mapped in situ to document the current distribution of <br />hardbottom resources within the pipeline corridors. <br />Task 2 Deliverable <br />FDEP requested a habitat characterization report to facilitate the Department's analysis of potential impacts to <br />hardbottom resources. The report shall summarize the findings of the hardbottom reconnaissance survey <br />described herein, which shall identify the location and distribution of hardbottom resources and describe the <br />benthic resources observed on the hardbottom. The report shall describe the methods used during the <br />reconnaissance surveys and data analysis, and will provide results of the survey in graphical, tabular and text <br />formats. Raw data, video files and shapefiles from the reconnaissance survey will also be included in the report <br />deliverable. Benthic biological data from previous monitoring efforts on the nearshore hardbottom adjacent to <br />the project area will also be presented in the habitat characterization report. <br />Task 2 Schedule <br />The in situ diver verification of hardbottom resources will take place after the sidescan sonar survey has been <br />completed and the data has been processed. <br />Raw data from field operations will be submitted to the County and FDEP within 45 days and the monitoring report <br />will be submitted within 90 days of completion of the survey. <br />Task 2 Cost <br />The lump sum cost for this task is $54,412.65. <br />Summary <br />The total lump sum cost to perform the proposed work described herein for Sector 3 — 2018006 — Work Order #6 <br />is $96,629.15. Please refer to Exhibit 1, attached to the end of this proposal, for a summary of the costs and labor <br />hours of each Task. APTIM will proceed with the tasks upon receipt of a signed work order from Indian River <br />County (unless stated otherwise in the schedule). <br />Thank you for the opportunity to serve Indian River County. We look forward to continuing to provide expert <br />professional services to the County. Please do not hesitate to call if you have any questions. <br />