My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-130
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:03:10 PM
Creation date
9/9/2019 1:29:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/13/2019
Control Number
2019-130
Agenda Item Number
8.J.J.
Entity Name
Kimley Horn
Subject
Roseland elevated tank conversion to repump station
Bid Number
CCNA work order No. 19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provide written comments and respond to Owner's contractor within a reasonable time. <br />Consultant will endeavor to complete the reviews within a 1 to 2 -week timeframe. <br />Consultant will provide on-site observation of construction. It is assumed that an additional (15) <br />half days of observation will be provided by a project engineer or resident inspector. <br />Consultant will attend a preconstruction meeting. <br />Consultant will develop a punch -list of incomplete items based on our on-site observations. <br />Consultant will issue a written punch -list to Owner and contractor. Consultant will provide one <br />(1) site visit to review follow up work on punchlist items. <br />Consultant will provide an additional certification of construction completion for the watermain <br />project not included in the original scope. Consultant will submit form FDEP Form 62- <br />555.900(9) and appropriate attachments for partial clearance of permit, which includes both the <br />booster pump station and watermain. <br />Record drawing information will be provided by the contractors and included with the <br />certification package. Four (4) hard copies and one electronic copy in pdf and Word format will <br />be furnished to IRCU. <br />TIME SCHEDULE <br />Consultant will complete these tasks in a timely and mutually agreed upon schedule. It is <br />anticipated that the following task schedule will be provided: <br />TASK 1— CONSTRUCTION PHASE 3 — 4 MONTHS <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting Engineering <br />Services Agreement for Professional Services dated April 17th, 2018 with Indian River County. <br />The Consultant will provide professional services for Task 1 on a lump sum fee basis as follows: <br />Task No. <br />Task <br />Task Fee <br />Task 1 <br />CONSTRUCTION PHASE <br />$ 37,956 <br />Total Lump Sum Fee <br />$ 37,956 <br />
The URL can be used to link to this page
Your browser does not support the video tag.