My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-131
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:11:40 PM
Creation date
9/9/2019 1:35:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/13/2019
Control Number
2019-131
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates 85th Street Millings from 101st Avenue to 96th Avenue
Area
Vero Lake Estates
Project Number
IRC-1628
Bid Number
Bid 2019012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cause of loss covered by any property <br />or part thereof by OWNER during partial <br />utilization pursuant to paragraph 11.05, after <br />11.01, or after final payment pursuant to <br />paragraph 14.07. <br />C. Any insurance policy maintained by OWNER <br />covering any Iosc, damage or consequential Toss <br />referred to in paragraph 5.07.B shall contain <br />any such low, damage, or consequential loss, the <br />ENGINEER's Consultants and the officers, directors, <br />partners, employees, agents, and other consultants <br />5.08 Receipt and Application of Insurance <br />Proceeds <br />A. Any insured loss under the policies of <br />-e e -e -e t_ • e- __ . - <br />with OWNER and made payable to OWNER as <br />fiduciary for the insureds, as their interests may <br />shall deposit in a separate account any money so <br />other special agreement is reached, the damaged <br />Work shall be repaired or replaced, the moneys -se <br />and the cost thereof covered by an appropriate <br />B. OWNER as fiduciary shall have power to <br />days after the occurrence of los to OWNER's <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />A. If either OWNER or CONTRACTOR has any <br />receipt of thc certificates (or other evidence <br />shall ach provide to the other <br />provided as the other may reasonably request. If <br />Contract Documents, such party shall notify the other <br />party in writing of such failure <br />any change in thc required coverage. Without <br />and a Change Order shall be isucd to adjust the <br />Contract Price accordingly. <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />00700 - General Conditions REV 5-10-13 <br />00700 - 18 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1628-85th Street_96th Ave to 101st Ave_ Roadway Improvements \1-Admin\Bids\Bid Documents\Master Contract Documents\00700 <br />- General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.