My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-131
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:11:40 PM
Creation date
9/9/2019 1:35:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/13/2019
Control Number
2019-131
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting
Subject
Vero Lake Estates 85th Street Millings from 101st Avenue to 96th Avenue
Area
Vero Lake Estates
Project Number
IRC-1628
Bid Number
Bid 2019012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTHER ISSUES <br />• Review and comment with questions and clarifications as soon as possible, no further comments 10 <br />days prior to bid opening (Bid opening is May 15, 2019, deadline for questions is May 5, 2019). <br />• The Notice to Proceed to be determined after award of bid. <br />• Maintenance of Traffic: <br />o Contractor will be required to submit a Maintenance of Traffic Plan signed & sealed by a <br />Florida registered professional engineer to the Traffic Division and receive approval. <br />o Access for all residences, roads, school buses, sanitation and US Postal Service shall be <br />maintained at all times. <br />o The Maintenance of Traffic Plan shall meet the FDOT Index 600, FY 2017-2018 edition & <br />MUTCD minimums. <br />• Excavation material — to be removed and disposed of by Contractor unless otherwise called for in <br />plans and bid documents. This material may be utilized on site if deemed suitable. <br />• Testing by TBD <br />• Work hours are 7:00 AM -5:00 PM. <br />• A hurricane contingency plan shall be submitted to the County prior to construction in case of a <br />significant tropical/weather event. <br />• Material storage and staging areas. <br />• ,Invoicing: Contractor shall submit monthly invoices — one (1) original Contractor's Application for <br />Payment (Section 00622 in Contract Docs), including Surety's Consent and all applicable releases <br />of liens. <br />• PERMITS — SJRWMD permit is not required for this project. <br />DISCUSSION <br />• Clarification was given that the work hours are Monday through Friday. <br />• It was asked if the Itemized Bid Schedule could be distributed to the bidders in Excel format. It <br />was determined after the meeting that it will not be distributed. <br />• The Autocad file can be provided to the successful bidder of this project. <br />• The roadway construction method of "Chip Seal" is not an option for this project. <br />• The budget for this project was not available at the time of the meeting. <br />• Material storage and staging areas have not been identified at this time. <br />• There is an Addendum forthcoming that will include the pavement markings for the Alternative <br />Bid. <br />• Meeting adjourned at 10:20 AM. <br />ATTACHED <br />Sign in sheet <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \I628 -85th Street_96th Ave to lolst Ave_ Roadway Irnprovements\I- <br />Admin \Meetings\PreBid'':1628_Pre-Bid Meeting Min utes_20 I 90425.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.