My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/02/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:32:09 PM
Creation date
9/11/2019 11:32:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />November 9, 2018 <br />and cement quantities and additional base material will also need to be updated. We will also develop <br />a new base sheet for Lassiter to provide the striping changes. <br />SCHEDULE <br />With current work Toad we estimate this will take 6 to 7 weeks to complete the work from notice of <br />authorization <br />COMPENSATION <br />We will provide the requested services on a Lump Sum Cost, with estimated task breakdown below: <br />Additional Design Services: <br />Task <br />Design Services <br />Fee <br />Bowman <br />As listed in the above table <br />$19,776 <br />Lassiter <br />As listed in the attached proposal <br />$9,360 <br />Mark up on Subconsultants <br />$0 <br />Total <br />$29,139 <br />Sincerely, <br />Eric L. Flavell; PE, F -ASCE <br />Project Manager/Senior Engineer <br />Bowman Consulting <br />321.270.8993 <br />eflaveMbowmanconsultinq.com <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.