My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/2019
CBCC
>
Meetings
>
2010's
>
2019
>
07/02/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:32:09 PM
Creation date
9/11/2019 11:32:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/02/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowman <br />Estimated Staff Loading for <br />Design Engineering Services for <br />58th Avenue FDR & Road Widening <br />W.O. 010514-01-001 <br />6/11/19 <br />TASK <br />PM Engineer 111 Inspector CAD Clerical TOTAL <br />Street Widening 77th St to 81st St <br />Meetings and coordination (util, etc) 3 12 4 19 <br />Widening, redesign and adjust model, x -sec 8 40 108 156 <br />Update Quantinte, bid sched, cost, etc 5 12 8 25 <br />Staff By Category Totals <br />16 64 0 120 0 0 200 <br />Billing Rate ($/hr) $153 $117 $87 $82 $66 <br />Total Personnel Cost ($) $2,448 $7,488 $0 $9,840 $0 $0 $19,776 <br />Staffing Ratio (% of total hrs) 8.0 32.0 0.0 60.0 0.0 0.0 <br />Average Personnel Cost ($/hr) 98.88 <br />Description of Other Project Costs <br />Total of other costs ($) $0 <br />Total Estimated Project Cost ($) $19,776 <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.