Laserfiche WebLink
Bowman <br />Estimated Staff Loading for <br />Design Engineering Services for <br />58th Avenue FDR & Road Widening <br />W.O. 010514-01-001 <br />6/11/19 <br />TASK <br />PM Engineer 111 Inspector CAD Clerical TOTAL <br />Street Widening 77th St to 81st St <br />Meetings and coordination (util, etc) 3 12 4 19 <br />Widening, redesign and adjust model, x -sec 8 40 108 156 <br />Update Quantinte, bid sched, cost, etc 5 12 8 25 <br />Staff By Category Totals <br />16 64 0 120 0 0 200 <br />Billing Rate ($/hr) $153 $117 $87 $82 $66 <br />Total Personnel Cost ($) $2,448 $7,488 $0 $9,840 $0 $0 $19,776 <br />Staffing Ratio (% of total hrs) 8.0 32.0 0.0 60.0 0.0 0.0 <br />Average Personnel Cost ($/hr) 98.88 <br />Description of Other Project Costs <br />Total of other costs ($) $0 <br />Total Estimated Project Cost ($) $19,776 <br />51 <br />