My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-158
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:26:42 PM
Creation date
10/8/2019 8:15:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/17/2019
Control Number
2019-158
Agenda Item Number
8.N.
Entity Name
Kimley Horn & Associates
Subject
Ixora Park sewer system rehabilitation
Area
Ixora Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Work Order Number 15 <br />Indian River County Department of Utility Services <br />Ixora Park Sewer System Rehabilitation <br />PROJECT UNDERSTANDING <br />The Ixora Park neighborhood has a public sewer system that consists of <br />approximately 9,710 linear feet (LF) of gravity sewer and 23 manholes connecting to <br />a lift station at the northwest corner of the property. Indian River County Utilities <br />(IRCU) has identified a large amount of sand in the pipes as well as the <br />undermining of the roadways, both indicators of severe defects of the vitrified clay <br />pipe (VCP). <br />Kimley-Horn and Associates, Inc. (the Consultant) completed a Sewer System <br />Evaluation Survey (SSES) of the condition of the existing sewer infrastructure and <br />recommended improvements to rehabilitate or replace components of the system. <br />The Consultant understands that this scope of work shall cover the coordination of <br />pipe rehabilitation work and the design and bidding assistance of pipe replacement <br />work. <br />SCOPE OF WORK <br />The recommendations for the rehabilitation of the Ixora Park sewer system <br />included a Phase 2 SSES for the approximately 2,500 LF of pipes that were <br />previously unable to be surveyed, approximately 4,100 linear feet (LF) of pipe lining <br />with lateral rehabilitations, and approximately 3,110 LF of full sewer pipe <br />replacement. The Consultant will provide the following tasks for IRCU. <br />TASK 1 - PHASE 2 SSES <br />Approximately 2,500 LF of gravity sewer pipe was excluded from the SSES <br />completed in May 2019 by the Consultant as CCTV was unavailable. The pipes that <br />were unable to be surveyed are indicated on Figure 1. Since the completion of the <br />original SSES, IRCU has completed the CCTV inspection of these pipes. The CCTV <br />will be used to complete an additional SSES report and recommendations. <br />F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\19-0607 Ixora Park\Admin\Ixora Rehab Scope.docx Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.