My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-158
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:26:42 PM
Creation date
10/8/2019 8:15:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/17/2019
Control Number
2019-158
Agenda Item Number
8.N.
Entity Name
Kimley Horn & Associates
Subject
Ixora Park sewer system rehabilitation
Area
Ixora Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1.1- Existing Sewer Infrastructure Assessment <br />Consultant will assess CCTV video of the previously unsurveyed 2,500 LF of <br />existing gravity mains provided by IRCU. Pipe defects will be recorded utilizing a <br />standardized coding system in accordance with the National Association of Sewer <br />Service Companies (NASSCO) Pipeline Assessment and Certification Program <br />(PACP). <br />Task 1.2 - Report and Recommendations <br />Consultant will develop a report identifying and prioritizing deficiencies according <br />to NASSCO standards. <br />Consultant will evaluate options for correcting the defects within the system, <br />including but not limited to point repairs, joint repairs, lining of existing pipe, and <br />full pipe replacement. <br />Consultant will make recommendations for improvements to the system based on <br />the findings and will provide an Opinion of Probable Cost (OPC). The design of the <br />recommendations is not included in this contract. <br />The OPC from the Phase 1 Ixora Park SSES will be appended to include these Phase <br />2 SSES costs, providing a comprehensive OPC for the full Ixora Park sewer <br />rehabilitation. <br />The Consultant will provide a draft copy of the report in PDF format to IRCU and <br />will hold a meeting with IRCU to review the results if required. A hard copy and a <br />PDF copy of the final report will be provided to IRCU for a final deliverable. <br />TASK 2 -PIPE LINING AND LATERAL REHABILITATION <br />Approximately 4,100 LF of gravity sewer pipe was recommended to be cleaned and <br />lined using cast -in-place pipe (CIPP) and nine laterals on these pipes were <br />recommended for rehabilitation. The pipes recommended to be lined are indicated <br />on Figure 1. The Consultant will prepare design specifications for the pipe lining <br />and lateral rehabilitation work to be completed. <br />The Consultant will prepare one set of bid documents for pipe lining and one set of <br />bid documents for lateral rehabilitation. Consultant will provide up to three (3) <br />F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\19-0607 Ixora Park\Admin\Ixora Rehab Scope.docx Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.