My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-147
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:21:56 PM
Creation date
10/17/2019 11:43:44 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/10/2019
Control Number
2019-147
Agenda Item Number
8.X.
Entity Name
Guettler Brothers Construction,
Subject
49th Street Milling and Resurfacing, 58th Avenue to 31st Avenue
FM NO. 436850-1-54-01
Project Number
IRC-1414
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pg. 3 Initial: /"Jj <br />9. Permittee, as a 'condition RS the. continuance of this Permit, shall,reimburse District <br />immediately upon demand, for arty testing or other costs or expenses to District associated <br />with or arising from Permittee's use of District facilities. <br />10. Applicant is cautioned that electrical, water and sewer, cir other installations or <br />utilities may be located within the construction area, and .applicant shall use diligent <br />efforts to first detect, and locate all such installations and shall coordinate construction <br />'with all other lawful users of said right-of-way. Applicant shall be liable for all damages <br />proximately resulting from its interference with or interruption of services provided by <br />other lawful right-ofway users. <br />11. This permit shall be considered to be a license only, for the limited purpose of <br />installation, placement and maintenance of the improvements specified on the face <br />hereof, and does not convey any other right, title or interest of the District in the subject <br />right-of-way property. <br />12. An as-built/location certification of all culvert/structure installations within the District's <br />canals/right-of-way shall be performed by a Florida Registered Professional Surveyor and <br />Mapper on form provided by the District, and submitted to the Dittrict within thirty (10) <br />days following completion of installation. If as -built certitiOation is not received Within <br />thirty days of installation, the District will either have certification completed at <br />owner/applicants expense or order removal of the installation. <br />By initialing and dating this page I am agreeing to all standard and special provisos: <br />Initial: kip— Date: 47 2 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.