Addendum #1 <br />1.2 PERMITS <br />A. The OWNER has obtained certain permits for this project and they are listed in <br />paragraph 6.08.B of the EJCDC Standard General Conditions of the Construction <br />Contract (General Conditions). Per paragraph 6.08.0 of the General Conditions, <br />apply for and obtain all other required federal, state, and local permits, licenses, <br />sampling, and tests. <br />B. Provide copies of all approved permits to the OWNER and ENGINEER and comply <br />with all conditions contained in all permits at no extra cost to the OWNER. If there is <br />a conflict between any permit requirement and these Specifications or requirements <br />between permits, the more stringent specification or requirement shall govern. <br />C. Pay for all required water quality sampling and laboratory tests. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans, permits, and these <br />Specifications; and the installed system has been examined by the OWNER for <br />compliance. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing laboratory <br />selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER <br />determines that the pollution control and treatment system is not in compliance with <br />the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution control <br />and treatment system is properly constructed or repaired, and complies with the <br />approved pollution control and treatment system plans, specifications, contract <br />documents, and permits. <br />C. Schedule construction to minimize erosion and stormwater runoff from the <br />construction site. Implement erosion control measures on disturbed areas as soon as <br />practicable in portions of the site where construction activities have temporarily or <br />permanently ceased, but in no case more than 7 days after the construction activity in <br />that portion of the site has temporarily or permanently ceased. In addition to other <br />temporary erosion control measures that may be implemented, application of <br />polyacrylamide is required on all such disturbed areas within 7 days after the <br />construction activity in that portion of the site has temporarily or permanently ceased, <br />unless final landscaping has been installed. Polyacrylamide application shall be as <br />specified herein. Include polyacrylamide application in the Project's SWPPP. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required until the system <br />is no longer needed. If a water quality violation occurs, immediately cease all work <br />contributing to the water quality violation and correct the problem. Immediately report <br />01025-5 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1414-49th St_58th Ave to 31st Ave \1-Admin\Bids\Bid <br />Documents\Adendums\Technical Specifications uPDATED 5-25-2017.doc <br />