Laserfiche WebLink
Addendum #1 <br />all water quality violations to the OWNER. Immediately report the discharge of any <br />hazardous substance to the State Warning Point at 800-320-0519 or 850-413-9911. <br />E. Discharge shall not violate State or local water quality standards in receiving waters, <br />nor cause injury to the public health or to public or private property, nor to the Work <br />completed or in progress. The receiving point for water from construction operations <br />shall be approved by the applicable owner, regulatory agency, and the ENGINEER. <br />The receiving point shall be shown on the Project SWPPP. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and <br />treatment systems in accordance with Section 1340. <br />B. Approved Stormwater Pollution Prevention Plan. <br />C. "Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering Water <br />and Stormwater From Construction Activities" <br />1.5 STORMWATER TREATMENT AND EROSION CONTROL SYSTEM <br />RESPONSIBILITY <br />A. Prepare a site-specific design of the erosion and stormwater pollution control system. <br />Install and maintain all erosion and stormwater pollution control devices under the <br />supervision of a State Certified Stormwater, Erosion, and Sedimentation Control <br />Inspector. Maintain the erosion and stormwater pollution control devices until in the <br />ENGINEER's sole opinion, the devices are no longer necessary (such time not to <br />extend past the date the OWNER formally accepts the project as complete). Before <br />beginning construction, submit to Indian River County, Florida Department of <br />Environmental Protection (FDEP) and other applicable regulatory agencies for review <br />and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the <br />certified erosion control subcontractor. Construction shall not begin until the SWPPP <br />has been approved by Indian River County, FDEP, and all applicable regulatory <br />agencies. Submit the approved SWPPP to the ENGINEER before beginning <br />construction. Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion <br />Control and Treatment of Dewatering Water and Stormwater From Construction <br />Activities" (located at the end of this Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.B, 1.6.C, <br />and 1.6.D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />alteration of the chemical, physical, biological, or radiological integrity of off-site water <br />in quantities or at levels which are or may be potentially harmful or injurious to human <br />health or welfare, animal or plant life, or property. Pollutants to be removed include <br />01025-6 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1414 -49th St_58th Ave to 31st Ave \1-Admin\Bids\Bid <br />Documents\Adendums\Technical Specifications uPDATED 5-25-2017.doc <br />