My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-149
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 2:22:35 PM
Creation date
10/17/2019 11:52:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/10/2019
Control Number
2019-149
Agenda Item Number
8.Z.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
LLC Work Order Number 2018029-5, Sector 5 (City of Vero Beach) Beach and Dune Restoration Project,
LGFR and Immediate Post-Construction Environmental Monitoring
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A APTIM <br />August 8, 2019 <br />Page 3 of 5 <br />delineate the hardbottom edge and monitor the transects will take up to eight (8) field days. <br />The data will be compiled and incorporated into a GIS database and in situ data Will be entered into an Access <br />database. Time to complete data entry, reduction, analyses, and report production is included in the cost <br />estimate to address the data management and reporting requirements for those 8 days of field operations. <br />Task 2: Deliverable <br />Raw data will be provided to FDEP and the County within 45 days of completion of the survey. This includes a PDF <br />of the scanned datasheets, excel spreadsheets with quadrat data, interval sediment depth measurements and <br />line -intercept data, shapefiles of the hardbottom edge survey, video and photo documentation. Additionally, <br />APTIM will provide a map of the project area and adjacent hardbottom resources with the hardbottom edge <br />delineation and monitoring transects overlaid onto recent, clear aerial photographs (in digital format). <br />An immediate post -construction biological monitoring report will be generated for submittal to the County and <br />regulatory agencies. <br />Task 2: Schedule <br />The immediate post -construction monitoring event will take place during summer 2020. Raw data from field <br />operations will be submitted to the County and FDEP within 45 days and the monitoring report will be submitted <br />within 90 days of completion of the survey. <br />Task 2: Cost <br />The lump sum cost for this task is $77,875.30. <br />Task 3: Immediate Post -Construction Sea Turtle and Shorebird Monitoring <br />The Sector 5 immediate post -construction sea turtle and shorebird monitoring will be managed and coordinated <br />by APTIM, and conducted by APTIM's approved subconsultant, Ecological Associates, Inc. (EAI). <br />Task 3: Scope of Work <br />APTIM will oversee the scope of work proposed by EAI and provide the necessary administrative coordination to <br />the County. The 2020 sea turtle monitoring effort along the approximate 3.5 mile shoreline within the Sector 5 <br />Project Area addresses permit -required post -construction sea turtle and shorebird monitoring. The monitoring <br />will comply with all applicable conditions set forth in the regulatory permits and related authorizations for the <br />project. EAI has provided the enclosed proposal and cost breakdown for sea turtle monitoring tasks, which are <br />summarized as follows: <br />A. Mobilization and Management <br />B. Sea Turtle Monitoring and Data Management <br />C. Nest Marking and Monitoring <br />D. Nesting Shorebird Monitoring <br />E. Post -Construction Escarpment Surveys <br />F. Lighting Surveys <br />G. Reporting <br />
The URL can be used to link to this page
Your browser does not support the video tag.