ORDER NO. PSC -2019 -0265 -PAA -EQ <br />DOCKET NO. 20190082 -EQ <br />PAGE 48 <br />FLORIDA POWER & I IG <br />COMPANY <br />Attachment A <br />Original Sheet No. 10317 <br />(Continued frotn Sheet No. 10.316) <br />IV. PLANT' DISPATCHABILITY/CONTROLLABILITY <br />• Provide the following operating characteristics and a detailed ergtlanation supporting the performance capabilities indicated. <br />♦ karnp Rale (MWhninute) <br />t Peak Capability (% above Committed Capacity) <br />• Minimum power level (% of Committed Capacity) <br />s Facility Turnaround Tinie, blot to Hot (hours) <br />• Start-up Time from Cold Shutdown (hours) <br />• Unit Cyclirw (;1 cycles/yr) <br />• MW and M VA R Control (AGC, Manual, Other (please explain)) <br />V. SITING AND L1C}2VSINC <br />• Provide a licensing/permitting milestone schedule which lists all permits, licenses and variances required to site the Facility. <br />The milestone schedule shall also identify key milestone dates for baseline monitoring, application preparation, agency review, <br />certification and licensing/siting board approval, and agency permit issuance. <br />• Provide a Iicensing/pemtitting plan that addresses the issues of air emissions, water use, wastewater discharge, wetlands, <br />endangered species, protected properties, solid waste, surrounding land use, zoning for the Facility, associated linear facilities, <br />and support of and opposition to the facility, <br />• List the cmissiori/ef 1ucnt discharge limits the Facility will meet, and describe in detail the pollution control equipment to be <br />used to meet these limits. <br />VI. FACILITY DF,VF,LOPMENT AND PERFORMANCE <br />• Subnut .a detailed engineering, procurement, conistmction, startup and commercial operation schedule. The schedule shall <br />include milestones for site acquisition, ennineeri"g phases, selection of the major equipment vendors, architect engineer, EPC <br />contractor, and Facility operator, steam Most integration, and delivery of major equipment. A discussion of the current status of <br />each milestone should also be included where applicable. <br />• Attach a diagram of the power block arrangement. Provide a list of the major equipment vendors and the name arid model <br />number of the major equipment to be installed. <br />• Provide a detailed description of the proposed environmental control technology for the Facility- and describe the capabilities <br />of the proposed technology. <br />• Attach preliminary, flow diagrams for the steam system, water system, and fuel system, and a main electrical one line diagram <br />for the Facility. <br />• State the expected heat rate (HHV) et 75 degrees Fahrenheit for loads of 100%, 75%, and 50%. In addition, attach a <br />preliminary heat balance for the Facility. <br />• [NOTE: add any requirements related to demonstrating that the facility meets the requirements under the statute or applicable <br />rules] <br />(Continued on Sheet No. 10.318) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: May 22, 2007 <br />