Laserfiche WebLink
Final Version <br />the necessary pipelines, improvements, and equipment needed to transport, meter and <br />use the LFG in the Facility. On or before the LFG Commencement Date, Company <br />shall provide written notification to District that all such pipelines, improvements, and <br />equipment are fully operational. <br />D. Company shall install, calibrate, and maintain appropriate Meters to <br />measure the quantity and quality of the LFG at the Delivery Point in accordance with <br />Sections 6.3 and 6.8. <br />E. Company shall provide the necessary controls and automation to cause LFG <br />to be diverted to the District's flare if the Facility is not taking delivery of LFG from <br />the Landfill and to allow simultaneous operation of the flare and the Facility, if <br />necessary. <br />F. The District shall not be obligated to pay for any LFG expansion <br />piping/wells. <br />G. To comply with its permit requirements the District may, from time -time, <br />have to expand its gas collection system. If that happens the District will notify the <br />Company because these expansions may impact LFG delivery to the Company. <br />H. Company shall pay the rates set forth in Article 8 for all of the LFG it <br />receives from the District. <br />I. Company is responsible for the disposal of Condensate generated by the <br />Company LFG Assets. On a quarterly basis, the Company shall sample and analyze the <br />condensate from its equipment to verify that it is non -hazardous. If it is determined to <br />be hazardous, then the Company shall be responsible for the proper disposal of the <br />hazardous Condensate. To the extent the Condensate is determined to be hazardous <br />because of the Company processing it (i.e.: compressing the LFG or concentrating the <br />condensate), the Company will not be eligible for reimbursement from the District for <br />the Company costs of disposing such hazardous Condensate. To the extent the <br />Condensate is determined to be hazardous because of activities at the Landfill, the <br />Company will be entitled to reimbursement from the District for the Company costs of <br />disposing such hazardous Condensate. <br />J. Company shall submit all permit applications to the District for review by <br />the District or its designee, subject to Sections 3.5 and 3.6. <br />K. Company shall provide to the District the qualifications and proof of annual <br />safety training of employees or contractors that are working on District's property. <br />L. Company reserves its right to reduce or terminate the flow of the Landfill <br />Gas to the Facility, and thus divert part or all of the Landfill Gas to the District's flare, <br />if the Facility's Landfill Gas processing equipment is not operating, or if the District is <br />not providing Acceptable LFG. Company is not obligated to pay the District for the <br />8 <br />