My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-177
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 4:53:04 PM
Creation date
11/19/2019 4:52:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/05/2019
Control Number
2019-177
Agenda Item Number
8.F.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 25
Hobart Park Renovations
Restroom Connections and Utility Service Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCNA2018 WORK ORDER NUMBER 25 <br />HOBART PARK RENOVATIONS, <br />RESTROOM CONNECTIONS AND UTILITY SERVICE PLANS <br />This Work Order Number 25 is entered into as of this 5th day of November <br />2019, pursuant to that certain Continuing Consulting Engineering Services Agreement for <br />Professional Services entered into as of this 17th day of April, 2018 (collectively referred to as <br />the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State <br />of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />EXHIBIT A — SCOPE OF WORK <br />Task 1— Preparation of Plans <br />The COUNTY desires to install restroom facilities at the southern portion of Hobart Park along <br />with the supporting water and sewer utilities servicing the building. As part of this scope <br />Kimley Horn will design a gravity sanitary sewer connection and a water tie in to a prefabricated <br />restroom facility as well as grading in the immediate area. <br />Kimley-Horn will prepare a dimensional site plan that conforms to local agency having <br />jurisdiction permitting requirements which will depict the location of the proposed restrooms, <br />sidewalks and landings and existing surrounding features. This plan will include site data <br />showing increase of impervious area on the site with the proposed improvements. <br />Kimley-Horn will prepare a limited Paving and Grading plan showing the proposed finished floor <br />elevation of the proposed restroom facilities and surrounding grades of proposed sidewalks. <br />The plan will identify paved areas for proposed sidewalk and associated details. <br />Kimley-Horn will prepare a limited Utility plan showing the existing utilities provided by <br />COUNTY GIS data and asbuilts on 77th Street. The limited Utility plan will also consist of the <br />proposed connection of sanitary and water service to the proposed restroom facilities. Kimley <br />
The URL can be used to link to this page
Your browser does not support the video tag.