Laserfiche WebLink
Work Order No. 25 <br />Hobart Park <br />Restroom Connections and <br />Utility Service Plans <br />Horn will coordinate with the manufacturer of the COUNTY selected restroom facility to <br />identify the inverts of the water and sanitary inverts leaving the proposed restroom facility. <br />In summary, the following plans will be prepared by the Consultant: <br />• Site Plan • Utility Plan <br />• Paving and Grading Plan • Detail Sheets <br />Kimley-Horn will revise the plans to address up to one (1) round of comments from each of the <br />permitting agencies under Task 3. <br />Kimley-Horn will prepare quantity take offs to incorporate into an engineering opinion of <br />probable cost as part of this task. The unit costs estimates will be based on pricing information <br />provided by contractors for previous projects completed. The opinion of probable cost will also <br />be based on assumptions that will be outlined in the document. <br />Kimley-Horn anticipates that electric service to the proposed restroom facility can be run off of <br />the existing service line to the existing restroom facility on the west side of the park. Kimley- <br />Horn will conceptual show a single PVC conduit to house a single phase 200 amp service from <br />the existing restroom facility to the proposed restroom facility on the utility plan. This will not <br />be in the area of the limited topographic survey, and will be shown on the utility plan for <br />reference to the contractor. <br />Task 2 —Topographic Survey <br />As part of this scope Kimley-Horn will prepare a specific purpose survey of the proposed area of <br />buildings and utilities (location of limited area provided by the COUNTY). The utilities will be to <br />service both the new proposed restroom facilities and the existing restroom facilities on the <br />east side of the park. This specific purpose survey shall consist of above ground existing <br />improvements, perimeter boundary lines, existing tree locations. The ground elevations will be <br />obtained on a 10' grid throughout the limited area. Any above ground visible improvements <br />within the limited area will be located. All elevations will be referenced to the North American <br />Vertical Datum of 1988 (NAVD 88). <br />Kimley-Horn will survey the existing sanitary sewer information for both locations, as well as <br />call 811 to mark existing utilities to incorporate locations into the proposed Topographic <br />Survey. <br />The topographic survey will be performed in accordance with the Standards of Practice set <br />forth in Chapter 5J-17 of the Florida Administrative Code. <br />Kimley-Horn will provide a digital base map of the surveyed property defined above as a base <br />for Site Construction Plan preparation. <br />Page 2 of 6 <br />