My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-177
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 4:53:04 PM
Creation date
11/19/2019 4:52:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/05/2019
Control Number
2019-177
Agenda Item Number
8.F.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order 25
Hobart Park Renovations
Restroom Connections and Utility Service Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 25 <br />Hobart Park <br />Restroom Connections and <br />Utility Service Plans <br />Task 3 - Permitting <br />As part of this scope Kimley Horn will prepare applications and supporting documentation for <br />the necessary permits to construct the new restroom facility and utility services to both the <br />eastern existing restroom facility and the new restroom facilitiy. <br />Kimley-Horn will submit to the Indian River County Planning Department for administrative <br />approval for the addition of the proposed restroom facility. <br />Kimley-Horn will submit for a utility construction permit for potable water and sanitary sewer. <br />This application will consist the equivalent residential use determination, projected water and <br />sewer flows and associated plans. <br />Kimley-Horn will prepare the supporting documentation for a St Johns River Water <br />Management District environmental resource permit exemption. Kimley-Horn will then submit <br />and coordinate with the District for an exemption determination from the St John River Water <br />Management District for the proposed improvements. <br />Kimley-Horn will prepare the supporting documentation to submit for an Indian River County <br />Type A stormwater permit exemption. <br />Kimley-Horn will attend a pre -application meeting with the Indian River Farms Water Control <br />District on the proposed utility crossings on their canal. Kimley-Horn will prepare an application <br />for utility construction permit through the District for approval of a water and sewer crossing. <br />It is assumed at this time that the sanitary can tie into the proposed sanitary near the new <br />restroom and will not require a separate dedicated service to service the existing restroom <br />facility on the east. <br />Due to the limited nature of the work, Kimley Horn does not anticipate more then one round of <br />comments from each of the agencies having jurisdiction above. Kimley-Horn will respond to up <br />to one round of comments from the permitting jurisdictions above as part of this task. <br />In summary the following permits are anticipated: <br />Indian River County Administrative Site Plan Approval <br />Indian River County Utility Construction Permit for Potable Water and Sanitary Sewer <br />St Johns River Water Management District Environmental Resource Permit Exemption <br />Indian County Type A Stormwater Permit exemption <br />Indian River Farms Water Control District permit for utility crossing <br />EXHIBIT B — FEE SCHEDULE <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.