Laserfiche WebLink
ENGINEERS <br />III. PROPOSED SCOPE OF CONSTRUCTION WORK <br />PROPOSAL #P18TPA-030 <br />A. Remove existing roof systems down to the existing structural deck and provide new roof system <br />along with sheet metal flashing and accessories to provide a complete, watertight, warrantable <br />roof assembly. <br />IV. ESTIMATED CONSTRUCTION COSTS & ENGINEERING FEES <br />Based on the anticipated scope of work for this project, the opinion of probable construction costs and <br />proposed engineering fees are: <br />EngineeringFees: <br />ees: <br />Contract Documents: <br />Contract Documents................................................................ $18,450.00 <br />Bidding....................................................................................... $1,250.00 <br />Construction Administration: <br />Construction Administration..................................................... $13,550.00 <br />Total Engineering Fee....................................................................... $33,250.00 <br />V. PROJECT SCHEDULE <br />A. Preliminary Contract Documents shall be completed within thirty (30) days of Notice to Proceed. <br />Final Contract Documents shall be completed and sealed within ten (10) days of receipt of <br />comments. <br />B. Construction Administration shall be performed during the estimated construction duration and <br />the project closeout process. This work is expected to take forty-five (45) days calendar days. <br />If this proposal meets with your approval, please notify us in writing. This proposal will remain firm for a period <br />of thirty (30) days. After that time, we reserve the right to review scheduled commitments and prices. <br />If you have any questions, please do not hesitate to call. <br />REI Engineers <br />Mark Renninger, PE, RRC <br />Branch Manager <br />Engineering solutions for tomorrow'" <br />10150 Highland Manor Drive, Suite 200 <br />Tampa, FL 33610 <br />PAGE I OF 3 <br />reiengineers.com <br />813.944.2137 <br />