My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-199
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:04:49 PM
Creation date
12/2/2019 1:22:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
11/19/2019
Control Number
2019-199
Agenda Item Number
15.B.3.
Entity Name
Geosyntec
Subject
Approve Amendment 1 to CCNA-2018 Work Order No 4
evaluation of a pilot study using evaporation technology for Leachate Management
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P.E. Managing Director <br />7 November 2019 <br />Page 5 <br />per gallon of residuals management and disposal costs, personnel needs, maintenance costs, and <br />other issues or concerns resulting from the site visit and evaluation of the pilot study. The total <br />cost of operation (i.e., engineering, permitting, landfill gas (LFG) usage, processing and disposal <br />of residuals, etc.) will be calculated and amortized over a 10 -year period. A draft memorandum <br />will first be issued to SWDD for review and will be finalized upon receipt of review comments. <br />SCHEDULE <br />Geosyntec will initiate work immediately upon receipt of Notice to Proceed (NTP) from SWDD. <br />Geosyntec has assumed a two-month period for completion of the pilot study. As previously <br />discussed, the actual pilot study would take 5 days to complete. However, the first month would <br />involve planning, correspondence with FDEP, coordination with SWDD, IRED and Heartland <br />prior to pilot study startup, and receipt and review of analytical test results following completion <br />of the pilot study. <br />BUDGET ESTIMATE <br />Geosyntec proposes to perform the above -referenced work on a lump sum basis for $19,975. A <br />detailed budget estimate is provided as Attachment A. The estimated budget for the scope of work <br />described herein is summarized as follows: <br />Phase I — General Consulting/Meeting Support/Project Management $2,653 <br />Phase 2 — Pilot Study Coordination and Site Visit $4,261 <br />Phase 3 — Evaluation of Pilot Study Results $6,232 <br />Phase 4 — Preparation of Technical Memorandum $6,829 <br />Total Budget Estimate $19,975 <br />Geosyntec will invoice SWDD each month of the project on a lump sum, percent complete basis <br />in accordance with our Agreement. Additional services or any significant change in the scope of <br />work will be performed using the Rate Schedule included in our Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.