My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/2019
CBCC
>
Meetings
>
2010's
>
2019
>
09/17/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 2:33:26 PM
Creation date
12/6/2019 10:24:50 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/17/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will review submitted contractor bids and prepare a written award <br />recommendation to IRCU. <br />ASSUMPTIONS <br />• Since this work is a direct replacement, permits from FDEP are not <br />anticipated. <br />• Contractor(s) will obtain any necessary Maintenance of Traffic (MOT). <br />• Road reconstruction will be limited to the area of full sewer pipe <br />replacement. <br />• Consultant can work on tasks 2 and 3 concurrently. <br />ADDITIONAL SERVICES <br />Any services not specifically provided for in the above scope will be billed as <br />Additional Services and performed at then -current hourly rates. Additional services <br />we can provide include but are not limited to construction phase services. <br />SCHEDULE <br />In general, the following schedule is anticipated from Notice to Proceed (NTP): <br />Task 1 PHASE 2 SSES <br />Task 2 PIPE LINING AND LATERAL REHABILITATION <br />Task 3 FULL SEWER PIPE REPLACEMENT <br />FEE SCHEDULE <br />4-8weeks <br />8 - 10 weeks <br />4 - 6 months <br />We will provide these services in accordance with our Continuing Services Contract <br />Agreement for Professional Services dated Apri117th, 2018, with Indian River <br />County. <br />The Consultant will provide professional services for Tasks 1 and 2 on a lump sum <br />fee basis as follows: <br />Task No. <br />Task <br />Task Fee <br />TASK 1 <br />PHASE 2 SSES <br />$11,889 <br />TASK 2 <br />PIPE LINING AND LATERAL REHABILITATION <br />$15,889 <br />TASK 3 <br />FULL SEWER PIPE REPLACEMENT <br />$52,441 <br />TOTAL <br />$80,219 <br />118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.