My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/04/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
06/04/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 1:04:50 PM
Creation date
12/9/2019 4:21:21 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/04/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAG <br />The Arnold Group of Florida, Inc:. <br />Quote Date: <br />04/30/J.9 <br />Bid Date: <br />OS/0J./J.9 <br />Quotation Prepared For: <br />Indian River County <br />T.801'. 27th Street <br />Bldg.A <br />Vero Beach, FL 32960 <br />Attn: Kirstin Leiendecker <br />kleiendecker@ircgov.com <br />Fax No.: <br />Here is the quote you requested. <br />Qty <br />U of M <br />Bid Item <br />J EACH t,49 21.-t,L <br />J EACH fl49-ZJ.•J.OL <br />2 EACH 1149-ZI.•J.SL <br />i:70 SunportLane, Suite 800 <br />Orlando, FL 32809 <br />Prepared By: <br />Julie K Colon <br />Phone: (423) 727.4040 <br />TAG Quote No.: <br />TAGQS338 <br />Project Data: <br />Project #: INT. IMPROVEMENTS• #J:806 <br />Name: INDIAN RIVER@ GRAND BARBOR BLVD <br />Location: INDIAN RIVER COUNTY <br />Descri .tion <br />MAST ARM COMBINATION <br />[Aso/S•P3/S/L] INCLUDES 39' <br />UPRIGHT, J.0' LUMINAIRE ARM 8 <br />IFD FIXTURE <br />MAST ARM COMBINATION <br />[Aflo/S•P4/S/L] INCLUDES 39' <br />UPRIGHT, J.0' LUMINAIRE ARM 8 <br />IED FIXTURE <br />MAST ARM COMBINATION <br />[A70/S•PS/S/L] INCLUDES 39' <br />UPRIGHT, J.0' LUMINAIRE ARM 8 <br />LED FIXTURE <br />EH -1 <br />$1.9,025.00 $1.9,02s.00 <br />$23,575.00 $23,575.00 <br />$27,970.00 $55,940.00 <br />Extended Price <br />Total <br />$98,540.00 <br />PRICES ARE FOR MATERIAL ONLY, NO INSTALLATION. <br />MAST ARM FINISH IS PAINT OVER GALVANIZED <br />FIXTURES QUOTED AS FACTORY STANDARD, GREEN. <br />LEAD TIME IS CURRENTLY 3t,.38 WEEKS FROM RECEIPT OF APPROVED SUBMITTAL AND WRITTEN <br />RELEASE FOR MANUFACTURE. <br />Quote is valid for 30 days. <br />Sales tax is NOT included. <br />Terms are Net 30. <br />Items not specifically listed are NOT included. <br />Pole I. D. tags are NOT included. <br />Foundation designs NOT included. <br />Sign arms NOT included, unless quoted as a separate line item or if noted within product description. <br />Luminaires for mast arms NOT included unless stated to be so within product descritpion. <br />Please contact me if I can be of further assistance. <br />The Arnold Group standard terms and conditions apply. <br />04/301J.9 TAGQsns <br />193 <br />1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.