Laserfiche WebLink
Date: May 16, 2019 Quote: DOT19-13292-3 <br />Imont V <br />GE <br />Lighting %sterns <br />Project Indian River Blvd and Grand Harbor <br />Blvd - Traffic <br />Location Indian River FL <br />Quote DOT1 9-13292-3 <br />To: Kirsten Leiendecker, P.E. <br />Indian River County <br />1801 27th Street <br />Bldg. A <br />Vero Beach FL 32960 <br />QTY Type <br />1 1 <br />1 2 <br />1 3 <br />1 4 <br />4 <br />1 <br />MFG <br />VALT <br />VALT <br />VALT <br />VALT <br />FDOT <br />GE <br />Quote <br />Page 1/2 <br />Dot Lighting, Inc. <br />6353 Millstone Drive <br />New Port Richey FL 34655 <br />Phone: (727) 375-0555 <br />Fax: (727) 375-0581 <br />From: Terry Worthington <br />Quoter Ph: <br />Email: terryw@dotlightinginc.com <br />For <br />Bid Date May 16, 2019 <br />Expires Jun 15, 2019 <br />Part <br />649-21-15-70 S FP/GV <br />A70/S - P5/S <br />649-21-10-60 S FP/GV <br />A60/S - P4/S <br />649-21-15-70 S FP/GV <br />A70/S - P5/S <br />649-21-6-50 S FP/GV <br />A50/S - P3/S <br />715-5-31 <br />LED Cobra Head Luminaire, Gray Finish <br />LOT "HIGHWAY GREEN" PAINT ADDER FOR <br />LUMINAIRES <br />"Highway Green" may not be available from GE. <br />Would need to match to RAL Color <br />Luminaires may need to be Field Painted by Others. <br />Total: <br />Notes: <br />MAST ARM NOTES: <br />Poles Quoted as Finish Paint Over Galvanized (5 Year Warranty) <br />Poles Sized Per FDOT 2017-2018 Design Standard Index #'s 17743, 17745 <br />Sign/Signal Hangers Not Included <br />Foundation Designs Not Included <br />Silicone Caulk NOT Included <br />Preshipment of Anchor Bolts Included <br />Paper Templates Included <br />Internally Illuminated Sign Arms Not Included <br />• Special handling required to maintain finish paint warranty <br />• Pole touch up must be performed by approved contractor. <br />• Shipping damaged to the paint system must be reported at time of delivery. <br />Terms and conditions of sale: <br />1) Quotation is subject to acceptance at time of order placement. Quoted unit prices <br />listed. Any variation in quantities may result in additional charges. <br />2) Estimated lead times are based on current business conditions and are subject to <br />Terry Worthington <br />Price <br />$27,252.00 <br />$21,858.00 <br />$27,252.00 <br />$20,870.00 <br />$659.00 <br />$800.00 <br />UQ ExtPrice <br />$27,252.00 <br />$21,858.00 <br />$27,252.00 <br />$20,870.00 <br />$2,636.00 <br />$800.00 <br />$100,668.00 <br />are based on the total quantities <br />change at time of release On <br />Page 1/2 <br />