Laserfiche WebLink
INDIAN RIVER COUNTY — NORTH COUNTY REGIONAL PARK PAGE 16 <br />AQUATIC FACILITY ROOFING REPLACEMENT SECTION 075216 <br />JUNE 7, 2019 MODIFIED BITUMINOUS MEMBRANE ROOFING <br />number of workers and which workers have completed manufacturers' training programs, <br />temperature of liquid membrane in kettle (if applicable) and at point of application and all <br />other pertinent data. Services of manufacturer's field representative are not intended to <br />supersede manufacturer's written requirements for inspection and testing to issue <br />warranty. <br />3.6 CLEANING <br />A. Clean roof areas of all roofing tools and unused materials. <br />B. Clean spilled membrane or other materials from exposed surfaces which were not to <br />receive roofing. <br />3.7 PROTECTION <br />A. Protect roof system from construction traffic. Utilize temporary protection of roof system if <br />extensive roof traffic is required. <br />3.8 SAMPLE ROOFING INSTALLER'S WARRANTY <br />A. WHEREAS of <br />herein called the "Roofing Installer," has performed roofing and associated work ("work") <br />on the following project: <br />1. Owner: <br />2. Address: <br />3. Building Name/Type: <br />4. Address: <br />5. Area of Work: <br />6. Acceptance Date: <br />7. Warranty Period: <br />8. Expiration Date: <br />B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly <br />as a subcontractor) to warrant said work against leaks and faulty or defective materials <br />and workmanship for designated Warranty Period, <br />C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions <br />herein set forth, that during Warranty Period he will, at his own cost and expense, make <br />