My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-190A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:18:33 AM
Creation date
12/11/2019 11:14:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/12/2019
Control Number
2019-190A
Agenda Item Number
8.D.
Entity Name
Tech Systems
Subject
North County Regional Park Aquatic Center Rood Replacement Contract
Area
North County Pool
Project Number
IRC-1826
Bid Number
2019074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY — NORTH COUNTY REGIONAL PARK PAGE 17 <br />AQUATIC FACILITY ROOFING REPLACEMENT SECTION 075216 <br />JUNE 7, 2019 MODIFIED BITUMINOUS MEMBRANE ROOFING <br />or cause to be made such repairs to or replacements of said work as are necessary to <br />correct faulty and defective work and as are necessary to maintain said work in a <br />watertight condition. <br />D. This Warranty is made subject to the following terms and conditions: <br />1. Specifically excluded from this Warranty are damages to work and other parts of the <br />building, and to building contents, caused by: <br />a. lightning; <br />b. peak gust wind speed exceeding Insert mph (m/s); <br />c. fire; <br />d. failure of roofing system substrate, including cracking, settlement, excessive <br />deflection, deterioration, and decomposition; <br />e. faulty construction of parapet walls, copings, chimneys, skylights, vents, <br />equipment supports, and other edge conditions and penetrations of the work; <br />f. vapor condensation on bottom of roofing; and <br />g. activity on roofing by others, including construction contractors, maintenance <br />personnel, other persons, and animals, whether authorized or unauthorized by <br />Owner. <br />2. When work has been damaged by any of foregoing causes, Warranty shall be null and <br />void until such damage has been repaired by Roofing Installer and until cost and <br />expense thereof have been paid by Owner or by another responsible party so <br />designated. <br />3. When work has been damaged by any of foregoing causes, Warranty shall be null and <br />void until such damage has been repaired by Roofing Installer and until cost and <br />expense thereof have been paid by Owner or by another responsible party so <br />designated. <br />4. Roofing Installer is responsible for damage to work covered by this Warranty but is not <br />liable for consequential damages to building or building contents resulting from leaks <br />or faults or defects of work. <br />5. During Warranty Period, if Owner allows alteration of work by anyone other than <br />Roofing_ Installer, including cutting, patching, and maintenance in connection with <br />penetrations, attachment of other work, and positioning of anything on roof, this <br />Warranty shall become null and void on date of said alterations, but only to the extent <br />said alterations affect work covered by this Warranty. If Owner engages Roofing <br />Installer to perform said alterations, Warranty shall not become null and void unless <br />Roofing Installer, before starting said work, shall have notified Owner in writing, <br />showing reasonable cause for claim, that said alterations would likely damage or <br />
The URL can be used to link to this page
Your browser does not support the video tag.