My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-190A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:18:33 AM
Creation date
12/11/2019 11:14:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/12/2019
Control Number
2019-190A
Agenda Item Number
8.D.
Entity Name
Tech Systems
Subject
North County Regional Park Aquatic Center Rood Replacement Contract
Area
North County Pool
Project Number
IRC-1826
Bid Number
2019074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOFING REPLACEMENT PROJECT <br />NORTH COUNTY REGIONAL PARK AQUATIC CENTER <br />JUNE 7, 2019 <br />DIVISION 7 — THERMAL AND MOISTURE PROTECTION <br />SECTION 076200 - SHEET METAL FLASHING AND TRIM <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Formed roof -drainage sheet metal fabrications. <br />2. Formed low -slope roof sheet metal fabrications. <br />1.2 PREINSTALLATION MEETINGS <br />PAGE 1 <br />SECTION 076200 <br />SHEET METAL AND FLASHINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.3 ACTION SUBMITTALS <br />A. Product Data: For each of the following <br />1. Underlayment materials. <br />2. Elastomeric sealant. <br />3. Butyl sealant. <br />B. Shop Drawings: For sheet metal flashing and trim. <br />1. Include plans, elevations, sections, and attachment details. <br />2. Detail fabrication and installation layouts, expansion -joint locations, and keyed <br />details. Distinguish between shop- and field -assembled Work. <br />3. Include identification of material, thickness, weight, and finish for each item and <br />location in Project. <br />4. Include details for forming, including profiles, shapes, seams, and dimensions. <br />5. Include details for joining, supporting, and securing, including layout and spacing <br />of fasteners, cleats, clips, and other attachments. Include pattern of seams. <br />6. Include details of termination points and assemblies. <br />7. Include details of expansion joints and expansion -joint covers, including showing <br />direction of expansion and contraction from fixed points. <br />8. Include details of roof -penetration flashing. <br />9. Include details of edge conditions. <br />10. Include details of special conditions. <br />11. Include details of connections to adjoining work. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Product Certificates: For each type of coping and roof edge flashing that is <br />ANSI/SPRI/FM 4435/ES-1 tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.