My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-190A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:18:33 AM
Creation date
12/11/2019 11:14:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/12/2019
Control Number
2019-190A
Agenda Item Number
8.D.
Entity Name
Tech Systems
Subject
North County Regional Park Aquatic Center Rood Replacement Contract
Area
North County Pool
Project Number
IRC-1826
Bid Number
2019074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />DISCUSSION <br />Questions & answers <br />Question 1. Can a perimeter be constructed around the entire building? <br />Answer 1. Yes, but the Contractor must allow access to and from the locker rooms. <br />Question 2. Is the pool open on Saturdays and Sundays? <br />Answer 2. Yes. <br />Question 3. Can we have a laydown area in a grassy area nearby? <br />Answer 3. Yes, Location shall be coordinated in the field with the Owner's <br />representative. The construction staging area shall have W-0" high chain link <br />perimeter fencing. <br />Question 4. Is waterproofing and stucco part of the scope and is it just the replacement <br />stucco from when flashing is replaced? <br />Answer 4. Specific details regarding waterproofing and stucco are spelled out in the plans <br />and specs <br />Question 5. Does the waterproofing include the whole underside of the soffit system? <br />Answer 5. See answer 4. <br />Question 6. Do we have to notify someone before we go to the site? <br />Answer 6. Yes, notify /RC Purchasing at purchasinq@ircpov.comso they can alert the facility <br />personnel that someone will be looking at and possibly accessing the roof. <br />Contractor to bring his own ladder. <br />Question 7. Are the standing seam wall panels to match existing color? <br />Answer 7. Yes. <br />Question 8. Should we provide aluminum so they do not rust? <br />Answer 8. Contractor to base bid on what is called out in the plans and specs. <br />lames Ennis, IRC— There is a lightning protection system that needs to be addressed as part of the <br />work which requires special certifications for preforming this work. <br />Material cut sheets will be required and should accompany shop drawing submittals for all <br />materials. The material certifications specific to the material lots shall be provided at the time of <br />delivery and prior to installation. <br />Meeting adjourned. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1826 North County Regional Park Aquatic Facility Roof <br />Replacement\1-Admin\Meetings\PreBid\IRC-1826 PREBID MINS 20191002.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.