My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-190A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:18:33 AM
Creation date
12/11/2019 11:14:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/12/2019
Control Number
2019-190A
Agenda Item Number
8.D.
Entity Name
Tech Systems
Subject
North County Regional Park Aquatic Center Rood Replacement Contract
Area
North County Pool
Project Number
IRC-1826
Bid Number
2019074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY — NORTH COUNTY REGIONAL PARK PAGE 4 <br />AQUATIC FACILITY ROOFING REPLACEMENT SECTION 074210 <br />JUNE 7, 2019 METAL WALL PANELS <br />4. Examine support conditions for compliance with requirements, including alignment between <br />and attachment to structural members. <br />5. Review flashings, special siding details, wall penetrations, openings, and condition of other <br />construction that will affect metal wall panels. <br />6. Review governing regulations and requirements for insurance, certificates,. and tests and <br />inspections if applicable. <br />7. Review temporary protection requirements for metal wall panel assembly during and after <br />installation. <br />8. Review wall panel observation and repair procedures after metal wall panel installation. <br />1.9 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver components, sheets, metal wall panels, and other manufactured items so as not to be <br />damaged or deformed. Package metal wall panels for protection during transportation and <br />handling. <br />B. Unload, store, and erect metal wall panels in a manner to prevent bending, warping; twisting, and <br />surface damage. <br />C. Stack metal wall panels horizontally on platforms or pallets, covered with suitable weathertight and <br />ventilated covering. Store metal wall panels to ensure dryness, with positive slope for drainage of <br />water. Do not store metal wall panels in contact with other materials that might cause staining, <br />denting, or other surface damage. <br />D. Retain strippable protective covering on metal wall panel for period of metal wall panel installation. <br />E. Protect foam -plastic insulation as follows: <br />1. Do not expose to sunlight, except to extent necessary for period of installation and <br />concealment. <br />2. Protect against ignition at all times. Do not deliver foam -plastic insulation materials to <br />Project site before installation time. <br />3. Complete installation and concealment of plastic materials as rapidly as possible in each <br />area of construction. <br />1.10 PROJECT CONDITIONS <br />A. Weather Limitations: Proceed with installation only when existing and forecasted weather <br />conditions permit assembly of metal wall panels to be performed according to manufacturers' <br />written instructions and warranty requirements. <br />B. Field Measurements: Verify locations of structural members and wall opening dimensions by field <br />measurements before metal wall panel fabrication, and indicate measurements on Shop <br />Drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.