Laserfiche WebLink
INDIAN RIVER COUNTY — NORTH COUNTY REGIONAL PARK PAGE 3 <br />AQUATIC FACILITY ROOFING REPLACEMENT SECTION 074210 <br />JUNE 7, 2019 METAL WALL PANELS <br />C. Material Certificates: For thermal insulation signed by manufacturers. <br />D. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified <br />testing agency, for each product. <br />E. Field quality -control reports. <br />F. Warranties: Sample of special warranties. <br />1.7 CLOSEOUT SUBMITTALS <br />A. Maintenance Data: For metal wall panels to include in maintenance manuals. <br />1.8 QUALITY ASSURANCE <br />A. Installer Qualifications: An employer of workers trained and approved by manufacturer. <br />B. Source Limitations: Obtain each type of metal wall panel and the roof panels described in Section <br />07411 from single source from single manufacturer. <br />C. Fire -Resistance Ratings: Provide metal wall panels identical to those of assemblies tested for fire <br />resistance per ASTM E 119 by a qualified testing agency. Identify products with appropriate <br />markings of applicable testing agency. <br />1. Indicate design designations from UL's "Fire Resistance Directory" or from the listings of <br />another qualified testing agency. - UL Class A. <br />D. Mockups: Build mockups to verify selections made under sample submittals and to demonstrate <br />aesthetic effects and set quality standards for fabrication and installation. <br />1. Build mockup of typical wall corner panel, including soffit, as shown on Drawings; <br />approximately one bay wide by one story high by full thickness, including insulation, <br />supports, attachments, and accessories. <br />2. Approval of mockups does not constitute approval of deviations from the Contract <br />Documents contained in mockups unless Architect specifically approves such deviations in <br />writing. <br />3. Approved mockups may become part of the completed Work if undisturbed at time of <br />Substantial Completion. <br />E. Preinstallation Conference: Conduct conference at Project site. <br />1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency <br />representative, metal wall panel Installer, metal wall panel manufacturer's representative, <br />structural -support Installer, and installers whose work interfaces with or affects metal wall <br />panels, including installers of doors, windows, and louvers. <br />2. Review and finalize construction schedule and verify availability of materials, Installer's <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />3. Review methods and procedures related to metal wall panel installation, including <br />manufacturer's written instructions. <br />