My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-190A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:18:33 AM
Creation date
12/11/2019 11:14:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/12/2019
Control Number
2019-190A
Agenda Item Number
8.D.
Entity Name
Tech Systems
Subject
North County Regional Park Aquatic Center Rood Replacement Contract
Area
North County Pool
Project Number
IRC-1826
Bid Number
2019074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY — NORTH COUNTY REGIONAL PARK PAGE 9 <br />AQUATIC FACILITY ROOFING REPLACEMENT SECTION 075216 <br />JUNE 7, 2019 MODIFIED BITUMINOUS MEMBRANE ROOFING <br />2.2 PERFORMANCE REQUIREMENTS <br />A. Roofing System Design: Tested by a qualified agency to resist the following uplift <br />pressures: <br />1. Corner Uplift Pressure: <br />2. Perimeter Uplift Pressure: <br />3. Field of Roof Uplift Pressure <br />106.9 Ibf/sq. ft. (kPa/sq. m) <br />71.0 Ibf/sq. ft. (kPa/sq. m) <br />42.3 Ibf/sq. ft. (kPa/sq. m) <br />B. Provide a roof membrane assembly consisting of two plies of a prefabricated, reinforced, <br />homogeneous Styrene -Butadiene -Styrene (SBS) block copolymer modified asphalt <br />membrane, applied over a prepared substrate. Both reinforcement mats shall be <br />impregnated/saturated and coated each side with an SBS modified bitumen blend and <br />coated one side with a torch grade SBS bitumen blend adhesive layer. The cross <br />sectional area of the sheet material shall contain no oxidized or non -SBS modified <br />bitumen. The adhesive layer shall be manufactured using a process that embosses the <br />surface with a grooved pattern to provide optimum burn -off of the plastic film and to <br />maximize application rates. The roof system shall pass 500 cycles of ASTM D 5849 <br />Resistance to Cyclic Joint Displacement (fatigue) at 14°F (-100C). Passing results shall <br />show no signs of membrane cracking or interply delamination after 500 cycles. The roof <br />system shall pass 200 cycles of ASTM D 5849 after heat conditioning performed in <br />accordance with ASTM D 5147. The assembly shall possess waterproofing capability, <br />such that a phased roof application, with only the modified bitumen base ply in place, can <br />be achieved for prolonged periods of time without detriment to the watertight integrity of <br />the entire roof system. <br />C. Roofing manufacturer shall select all products and installation techniques to conform with <br />all requirements herein. Thicknesses and material descriptions included herein are <br />minimums. Provide thicker materials or materials with higher performance values if <br />required by roofing manufacturer to comply with indicated performance requirements. <br />When a manufacturer offers multiple product grades (eg. basic, optimal, heavy duty) only <br />the top tier of products will be considered for acceptance. <br />D. The owner and/or the architect reserve the right to have all submissions tested by an <br />independent laboratory to confirm/dispute manufacturer's claim. <br />
The URL can be used to link to this page
Your browser does not support the video tag.