My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-190A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:18:33 AM
Creation date
12/11/2019 11:14:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/12/2019
Control Number
2019-190A
Agenda Item Number
8.D.
Entity Name
Tech Systems
Subject
North County Regional Park Aquatic Center Rood Replacement Contract
Area
North County Pool
Project Number
IRC-1826
Bid Number
2019074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY — NORTH COUNTY REGIONAL PARK PAGE 8 <br />AQUATIC FACILITY ROOFING REPLACEMENT SECTION 075216 <br />JUNE 7, 2019 MODIFIED BITUMINOUS MEMBRANE ROOFING <br />B. Construct and stage the project so that a phased application may be achieved. Phased <br />application maintains a water tight condition with the base ply and reinforcing plies to <br />vertical surfaces without the installation of the cap sheet. The base ply may stay exposed <br />to the elements for a maximum of 120 days. When roof top equipment and trades have <br />finished, the application of the cap sheet may begin. The manufacturer shall conduct an <br />inspection of the base sheet prior to the installation of the cap sheet. The contractor must <br />notify the manufacturer five (5) days in advance to schedule this inspection. Provide <br />manufacturer's written certification that a phased application is acceptable. <br />1.14 WARRANTY <br />A. Assembly Letter: Submit an assembly letter executed by an authorized representative of <br />the roof membrane system manufacturer, indicating that the manufacturer has reviewed <br />drawings and specifications, conditions affecting work and relationship of roof membrane <br />system with related work, and that manufacturer proposes to provide warranty as <br />referenced herein without further stipulation. <br />B. Manufacturer's Warranty: <br />1. Roof Guarantee: Upon successful completion of the project, and after all post <br />installation procedures have been completed, furnish the owner with the <br />manufacturer's twenty (20), year roof membrane labor and materials guarantee. The <br />guarantee shall be a term type, without deductibles or limitations on coverage amount, <br />and shall be issued at no additional cost to the owner. <br />C. Owner's Instructions <br />1. Care and Maintenance: Provide manufacturer's written Roof and Maintenance Guide <br />for maintenance of roof system including, inspection schedules, trouble shooting, early <br />signs of a potential problem and temporary emergency repairs. <br />PART 2 PRODUCTS <br />2.1 MANUFACTURER <br />A. Subject to compliance with specified criteria, provide primary membrane system <br />components and accessories as listed below: <br />1. Siplast, Basis of Design <br />2. Johns Manville <br />3. Soprema <br />
The URL can be used to link to this page
Your browser does not support the video tag.