My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-207
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:09:16 PM
Creation date
12/18/2019 2:26:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/17/2019
Control Number
2019-207
Agenda Item Number
8.B.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Agreement for professional services for Water Plant and Water resources engineering services
RFQ201970 Work Order 1
Area
South Oslo Rd Water Treatment Plant Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will include design drawings for duplicate and redundant yard piping for the <br />transfer piping from the clearwell to the storage tanks, and suction piping from the <br />storage tank outlet to the high service pumps. <br />Consultant will review the existing process trench and identify areas that require <br />structural repair and rehabilitation. Consultant will prepare construction drawings and <br />details for areas requiring rehabilitation. <br />Consultant will prepare design documents for replacement of process piping within the <br />building floor trench. The documents will detail limits of replacement, materials of <br />construction, and phasing to maintain treatment operations. <br />Consultant will evaluate methods of reducing scaling at the scrubber blowdown pump <br />station, consisting of alternate scale inhibitor addition, alternate makeup water source to <br />include reduced hardness of makeup water, and addition of CO2 solution feed to scrubber <br />blowdown. <br />Consultant will prepare drawings and specifications for upgrades to the laboratory room, <br />consisting of cabinet and countertop upgrades. Laboratory equipment replacement will <br />be specified by IRCU and be limited to replacement of similar type equipment. Major <br />renovation (plumbing & electrical change) of the room and cabinets is not included. <br />Consultant will prepare process and instrumentation diagrams (P&IDs) for the proposed <br />improvements. <br />Consultant will prepare electrical drawings and specifications, consisting of single line <br />diagrams, network drawings, electrical schematics and details. C&W Engineering will <br />provide the electrical design services. <br />Consultant will prepare an updated network diagram for the PLC and SCADA system <br />improvements. Control Systems Design, Inc. will provide these professional services. <br />It is estimated that approximately 80 - 104 drawings will be required as part of this <br />project. Consultant will prepare drawings for the following: <br />• Cover sheet (1 sheet) <br />• Legend, abbreviations, and general notes (3 sheets) <br />• RO Train modifications (8-10 sheets) <br />• Skid piping modifications and feedwater pump room (4-6 sheets) <br />• Trench piping (2-4 sheets) <br />• Trench repairs or flowable fill/structural slab (1-3 sheet) <br />• Chemical piping listed herein (3-4 sheets) <br />• Yard piping — transfer piping, tank supply piping, distribution piping (2-3 sheets) <br />• Post-treatment scrubber blowdown (1-2 sheets) <br />• Laboratory room upgrades (4 — 6 sheets) <br />F:\Utilities\UTILITY - Engineering\WATER\WTP - South RO\19-1115 South RO Water Treatment Plant <br />Improvements\Admin\Oslo WTP Water Plant Improvements 11.25.19.docx <br />Page 4 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.