My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-210
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:10:03 PM
Creation date
12/18/2019 2:44:37 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 12, 2019 <br />AAPTIM Page 2 of 3 <br />EXHIBIT 1 <br />• Observe construction activities at the beach and periodically visit the upland sand mine(s) <br />• Visually assess the quality of fill material delivered to the project site and placed on the beach <br />• Observe the Contractor's work for compliance with the contract documents and permits <br />• Photograph and document the project as the work progresses <br />• Communicate issues, deviations, and/or consistencies that may arise <br />• Attend progress meetings <br />Upon completion of sections of constructed beach, two (2) duplicate sand samples will be collected at <br />each FDEP Reference Monument profile line to assess the grain size, silt content, gravel content, and <br />Munsell color for compliance, in compliance with the approved Sediment QA/QC Plan. One (1) sample <br />will be quantitatively tested and the other archived for 120 days after project completion. <br />Deliverable <br />APTIM will prepare observation reports summarizing each site visit, which will be used to document the <br />project progress and events. APTIM will prepare a summary table of the sediment samples and test <br />results for the sediment compliance parameters, and a complete set of laboratory testing results as <br />required by the approved Sediment QA/QC Plan. The sediment testing results will be included in the <br />Project Completion Report. <br />Schedule <br />A fixed timeline cannot be provided because it is dependent upon the Contractor's progress and <br />construction schedule. <br />Cost <br />The lump sum cost for additional site observations under task 2 is $54,479.25. <br />Summary <br />The total lump sum cost to perform the proposed additional work described herein for Sector 5 — 2018029 <br />— Work Order #4, Admendment 1 is $54,479.25. Please refer to Exhibit 2, attached to the end of <br />this proposal, for a summary of the costs and labor hours of each Task. It is noted that some aspects of <br />this Work Order are dependent upon Contractor performance and are outside the control of APTIM and <br />the County. As such, the scope, schedule and cost described herein is provided as an estimate. APTIM <br />will strive to execute each phase of the work within budget and in as expeditious a manner according <br />to construction progress. We will coordinate with the County in the event that the scope, schedule, or <br />budget arise due to unforeseen issues or circumstances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.