My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-207A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-207A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:19:37 PM
Creation date
12/30/2019 3:19:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/17/2019
Control Number
2019-207A
Agenda Item Number
8.D.
Entity Name
Summerlin’s Marine Construction
Subject
Harmony Oaks area boardwalk construction
Area
220 7th Ave SE, Vero Beach, FL
Project Number
2020001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Written Amount: Forty-two thousand, four hundred eighty three dollars <br />If mutually agreed by OWNER and CONTRACTOR to be necessary for safety, balustrades may be <br />added to both sides of the boardwalk at a cost of $65 per If, and an estimated length of 30 total If <br />(not to exceed $1,950 additional). <br />ARTICLE 5 - PAYMENT PROCEDURES <br />5.1 Method of Payment <br />Owner shall make only one payment for the entire amount of the contract when the work has been <br />completed. Upon a determination of satisfactory completion, the COUNTY Project Manager will authorize <br />payment to be made. All payments for services shall be made to the CONTRACTOR by the COUNTY in <br />accordance with the Local Government Prompt Payment Act, as may be amended from time to time <br />(Section 218.70, Florida Statutes, et seq.). <br />5.2 Acceptance of Final Payment as Release <br />The acceptance by the CONTRACTOR of final payment shall be and shall operate as a release to the OWNER <br />from all claims and all liability to the CONTRACTOR other than claims in stated amounts as may be <br />specifically excepted by the CONTRACTOR for all things done or furnished in connection with the work <br />under this Agreement and for every act and neglect of the OWNER and others relating to or arising out of <br />the work. Any payment, however, final or otherwise, shall not release the CONTRACTOR or its sureties <br />from any obligations under this Agreement, the Request for Proposals or the Public Construction Bond. <br />ARTICLE 6 - INDEMNIFICATION <br />6.1 CONTRACTOR shall indemnify and hold harmless the OWNER, and its officers and employees, from <br />liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent <br />caused by the negligence, recklessness, or intentional wrongful misconduct of the CONTRACTOR and <br />persons employed or utilized by the CONTRACTOR in the performance of the Work. <br />ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS <br />7.1 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data <br />identified in the Request for Proposal documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site <br />conditions that may affect cost, progress, and performance of the Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that <br />may affect cost, progress, and performance of the Work. <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.