My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-207A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-207A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:19:37 PM
Creation date
12/30/2019 3:19:19 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/17/2019
Control Number
2019-207A
Agenda Item Number
8.D.
Entity Name
Summerlin’s Marine Construction
Subject
Harmony Oaks area boardwalk construction
Area
220 7th Ave SE, Vero Beach, FL
Project Number
2020001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning <br />conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect <br />cost, progress, or performance of the Work or which relate to any aspect of the means, methods, <br />techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including <br />applying the specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions <br />and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, <br />or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, <br />and in accordance with the other terms and conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site <br />that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations <br />obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all <br />additional examinations, investigations, explorations, tests, studies, and data with the Contract <br />Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies that <br />CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by OWNER is <br />acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and <br />conditions for performance and furnishing of the Work. <br />ARTICLE 8 - CONTRACT DOCUMENTS <br />8.1 Contents <br />A. The Contract Documents consist of the following: <br />(1) This Agreement (pages 1 to 8 inclusive); <br />(2) Notice to Proceed <br />(3) Certificate(s) of Liability Insurance <br />(4) Request for Proposals 2020001 <br />(S) Addenda (numbers 1to 2 inclusive); <br />(6) CONTRACTOR'S submitted proposal and responses to clarification; <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.