My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-207B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-207B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 12:51:08 PM
Creation date
1/13/2020 12:35:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/17/2019
Control Number
2019-207B
Agenda Item Number
8.C.
Entity Name
TLC Diversified, Inc.
Subject
Award of Bid# 2020009 Oslo Water Treatment Plant Blower Replacement
Area
15900 9th SW Vero Beach, FL 32962
Bid Number
0020009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of <br />Florida organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and TLC Diversified, Inc. hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in <br />consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />The proposed work generally consists of furnishing all labor, materials, tools and equipment <br />required to remove and install new degasifier blowers with FRP composite blades and ductwork <br />modifications necessary to provide a complete and functional system. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: <br />Bid Number: <br />Project Address: <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />Oslo Water Treatment Plant Blower Replacement <br />2020009 <br />1500 9th Street SW, Vero Beach, FL 32962 <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 270th day after <br />the date when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that <br />OWNER will suffer financial loss if the Work is not completed within the times specified in <br />paragraph 3.02 above, plus any extensions thereof allowed in writing as a change order to <br />this Agreement. Liquidated damages will commence for this portion of work. The parties <br />also recognize the delays, expense, and difficulties involved in proving in a legal proceeding <br />Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.