My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-207B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-207B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 12:51:08 PM
Creation date
1/13/2020 12:35:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/17/2019
Control Number
2019-207B
Agenda Item Number
8.C.
Entity Name
TLC Diversified, Inc.
Subject
Award of Bid# 2020009 Oslo Water Treatment Plant Blower Replacement
Area
15900 9th SW Vero Beach, FL 32962
Bid Number
0020009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, <br />instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated <br />damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $450 for each <br />calendar day that expires after the time specified in paragraph 3.02 for completion and <br />readiness for final payment until the Work is completed and ready for final payment. <br />ARTICLE 4 - CONTRACT PRICE <br />4.01 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds <br />equal to the sum of the amounts determined pursuant to paragraph 4.01.A and <br />summarized in paragraph 4.01.13, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract <br />Documents: <br />Numerical Amount: $208,100.00 <br />Written Amount: Two -hundred -eight thousand, one hundred dollars. <br />ARTICLE 5 - PAYMENT PROCEDURES <br />5.01 Progress Payments. <br />A. The OWNER shall make progress payments to the CONTRACTOR on the basis of the <br />approved partial payment request as recommended by ENGINEER in accordance <br />with the provisions of the Local Government Prompt Payment Act, Florida Statutes <br />section 218.70 et. seq. The OWNER shall retain ten percent (10%) of the payment <br />amounts due to the CONTRACTOR until fifty percent (50%) completion of the work. <br />After fifty percent (50%) completion of the work is attained as certified to OWNER <br />by ENGINEER in writing, OWNER shall retain five percent (5%) of the payment <br />amount due to CONTRACTOR until final completion and acceptance of all work to be <br />performed by CONTRACTOR under the Contract Documents. Pursuant to Florida <br />Statutes section 218.735(8)(b), fifty percent (50%) completion means the point at <br />which the County as OWNER has expended fifty percent (50%) of the total cost of <br />the construction services work purchased under the Bid and Specification <br />Documents, together with all costs associated with existing change orders and other <br />additions or modifications to the construction services work provided under the <br />Contract Documents. <br />Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.