shall be for the same purpose,and be for the same amount and subject to the same conditions
<br /> as those applicable to the bond otherwise required. The determination of the value of an
<br /> alternative form of security shall be made by the OWNER.
<br /> B. Such Bond shall continue in effect for one(1)year after acceptance of the Work by the OWNER.
<br /> C. The OWNER shall record the Public Construction Bond with the Public Record Sectionof the'2960.
<br /> Indian River County Courthouse located at 2000 16th Avenue,Vero Beach, Florida4
<br /> ARTICLE 7-INDEMNIFICATION
<br /> 7.01 CONTRACTOR shall indemnify and hold harmless the OWNER, and its commissioners, officers,
<br /> employees, and agents, from liabilities, damages, losses and costs, including but rot limited/to'',
<br /> reasonable attorney's fees, to the extent caused by the negligence, recklessness, or.intential
<br /> wrongful misconduct of the CONTRACTOR and persons enlloyed or utilized by the CON ACTOR
<br /> ./
<br /> in the performance of the Work. \
<br /> ARTICLE 8-CONTRACTOR'S REPRESENTATIONS (-----)
<br /> /1/...----)
<br /> 8.01 In order to induce OWNER to enter into this Agreemen"CONTRACTOR ma es the following
<br /> representations:
<br /> A. CONTRACTOR has examined and car's*f lllyy to ied he Contract Documents and the other related
<br /> data identified in the Invitation to Bid d'o mats.
<br /> B. CONTRACTOR has visit/e1"aheSite and become familiar with and is satisfied as to then r I local,
<br /> e a,
<br /> and Site conditions tat mayaffe t-cost_ ,progress,and>performance of the Work.
<br /> C. CONTRACTOR is familiar with and. is satisfied as to all federal,state,and local Laws and Regulations
<br /> that maya4ect-cost, progress�and'performance of the Work.
<br /> \-,...........:--....,..
<br /> ` \\
<br /> D. CONTRACTORV�has o tained'and carefully studied (or assumes responsibility for having done so) all
<br /> additional �or sLppl�ntary.ex urinations, investigations, explorations, tests, studies, and data
<br /> -oncerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the
<br /> Siteewhich maty affect cost, progress, or performance of the Work or which relate to any aspect of
<br /> the means, methods, techniques, sequences, and procedures of construction to be employed by
<br /> CON R C OR,i ?iclulding applying the specific means, methods, techniques, sequences, and
<br /> prQcedures\of�con truction, if any, expressly required by the Contract Documents to be employed
<br /> by CONTRACTdR,and safety precautions and programs incident thereto.
<br /> E. CO.NTRACTOR does not consider that any further examinations, investigations, explorations,tests,
<br /> `studiesrdata are necessary for the performance of the Work at the Contract Price, within the
<br /> Contract Times, and in accordance with the other terms and conditions of the Contract
<br /> Documents.
<br /> F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at
<br /> the Site that relates to the Work as indicated in the Contract Documents.
<br /> 27
<br />
|