Laserfiche WebLink
shall be for the same purpose,and be for the same amount and subject to the same conditions <br /> as those applicable to the bond otherwise required. The determination of the value of an <br /> alternative form of security shall be made by the OWNER. <br /> B. Such Bond shall continue in effect for one(1)year after acceptance of the Work by the OWNER. <br /> C. The OWNER shall record the Public Construction Bond with the Public Record Sectionof the'2960. <br /> Indian River County Courthouse located at 2000 16th Avenue,Vero Beach, Florida4 <br /> ARTICLE 7-INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify and hold harmless the OWNER, and its commissioners, officers, <br /> employees, and agents, from liabilities, damages, losses and costs, including but rot limited/to'', <br /> reasonable attorney's fees, to the extent caused by the negligence, recklessness, or.intential <br /> wrongful misconduct of the CONTRACTOR and persons enlloyed or utilized by the CON ACTOR <br /> ./ <br /> in the performance of the Work. \ <br /> ARTICLE 8-CONTRACTOR'S REPRESENTATIONS (-----) <br /> /1/...----) <br /> 8.01 In order to induce OWNER to enter into this Agreemen"CONTRACTOR ma es the following <br /> representations: <br /> A. CONTRACTOR has examined and car's*f lllyy to ied he Contract Documents and the other related <br /> data identified in the Invitation to Bid d'o mats. <br /> B. CONTRACTOR has visit/e1"aheSite and become familiar with and is satisfied as to then r I local, <br /> e a, <br /> and Site conditions tat mayaffe t-cost_ ,progress,and>performance of the Work. <br /> C. CONTRACTOR is familiar with and. is satisfied as to all federal,state,and local Laws and Regulations <br /> that maya4ect-cost, progress�and'performance of the Work. <br /> \-,...........:--....,.. <br /> ` \\ <br /> D. CONTRACTORV�has o tained'and carefully studied (or assumes responsibility for having done so) all <br /> additional �or sLppl�ntary.ex urinations, investigations, explorations, tests, studies, and data <br /> -oncerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the <br /> Siteewhich maty affect cost, progress, or performance of the Work or which relate to any aspect of <br /> the means, methods, techniques, sequences, and procedures of construction to be employed by <br /> CON R C OR,i ?iclulding applying the specific means, methods, techniques, sequences, and <br /> prQcedures\of�con truction, if any, expressly required by the Contract Documents to be employed <br /> by CONTRACTdR,and safety precautions and programs incident thereto. <br /> E. CO.NTRACTOR does not consider that any further examinations, investigations, explorations,tests, <br /> `studiesrdata are necessary for the performance of the Work at the Contract Price, within the <br /> Contract Times, and in accordance with the other terms and conditions of the Contract <br /> Documents. <br /> F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at <br /> the Site that relates to the Work as indicated in the Contract Documents. <br /> 27 <br />