My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2019
CBCC
>
Meetings
>
2010's
>
2019
>
11/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:49:07 PM
Creation date
1/15/2020 8:20:29 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/12/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC TRANSPORTATION DEVELOPMENT <br /> GRANT AGREEMENT EXHIBITS 00006/19 <br /> 9. Annual Plan or Update.The Agency shall submit a Transit Development Plan (TDP)or annual update to the <br /> Department by September 1 of each year. <br /> a) As a separate part of the transit development plan or annual report, the Agency will address potential <br /> enhancements to productivity and performance which would have the effect of increasing farebox ratio <br /> pursuant to Section 341.071(2), F.S. <br /> b) A TDP shall conform to the requirements in Rule 14-73, available at: <br /> http://fac.dos.state.fl.us/faconline/chapterl4.pdf. <br /> 10. Safety Requirements. Mark the required Safety submittal or provisions for this Agreement if applicable: <br /> Bus Transit System—In accordance with Section 341.061, F.S., and Rule 14-90, Florida <br /> Administrative Code, the Agency shall submit, and the Department shall have on file, an annual safety <br /> certification that the Agency has adopted and is complying with its adopted System Safety and Security <br /> Program Plan pursuant to Rule Chapter 14-90 and has performed annual safety inspections of all buses <br /> operated. <br /> Fixed Guideway Transportation System (established)—In accordance with Section 341.061, F.S., the <br /> Agency shall submit, and the Department shall have on file, annual certification by the Agency of <br /> compliance with its System Safety and Security Program Plan, pursuant to Rule 14-15.017 and the <br /> "Safety and Security Oversight Program Standards Manual", DOT Topic Number 725-030-014. <br /> Fixed Guideway Transportation System—This applies to New Starts projects and subsequent major <br /> projects to extend, rehabilitate, or modify an existing system, or to replace vehicles and equipment. In <br /> accordance with Section 341.061, F.S., the Agency shall submit a certification attesting to the adoption <br /> of a System Safety Program Plan pursuant to Rule 14-15.017 and the"Safety and Security Oversight <br /> Program Standards Manual", DOT Topic Number 725-030-014. Prior to beginning passenger service <br /> operations, the Agency shall submit a certification to the Department that the new start system or <br /> major modification to an existing system is safe for passenger service. <br /> Not Applicable. <br /> 11. Formula Information.As authorized in Section 341.052, F.S., the annual appropriation in the program is <br /> divided by formula and then distributed to each eligible transit system. The formula described below is <br /> adjusted each year based on data received from the transit systems'federally required National Transit Data <br /> (NTD) report.A copy of the NTD report is required to be sent to the Department each year. <br /> Distribution is accomplished through a multiple step process. 15%of the appropriation is given to the <br /> Commission for the Transportation Disadvantaged to be distributed to the Community Transportation <br /> Coordinators in accordance with Chapter 427, F.S.The remaining 85% is divided into three equal portions. <br /> Each eligible transit system gets a percentage of the first portion based on their percentage of total population <br /> served; the second portion is allocated based on their percentage of total revenue miles of service provided; <br /> and the third portion is allocated based on their percentage of total passengers carried. The total from all three <br /> portions is the total available allocation for each eligible transit system in the state. <br /> --End of Exhibit E-- <br /> 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.