My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-212B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-212B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 12:17:20 PM
Creation date
1/23/2020 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/17/2019
Control Number
2019-212B
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for SR60 and 43rd Avenue Intersection Improvements
Area
SR60 and 43rd Avenue Intersection
Project Number
Project No: IRC-0853,
Bid Number
BID NO. 219073
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid Number 2019073 <br />Addendum No. 3 <br />Page 3 of 3. <br />Question 15. Per Irrigation Plan Page IR 8, Irrigation Notes. The last note states," These drawings are not <br />complete unless accompanied by written specifications section NO. 02810 "Underground <br />Irrigation System" and section NO 02731 "Irrigation Well " <br />- Please provide these sections as they do not appear to be in the bid docs or addendums. <br />Answer 15. Above referenced specification sections have been provided as part of Addendumn #3. <br />Question 16. 1 am coming up with about 30% higher in quantity for pay item (0522 2) Conc. Sidewall< <br />and Driveways, 6" thick, can you please review that pay item. <br />Answer 16. Sidewalk and Driveway quantity has been adjusted. <br />Question 17. Who is responsible for removing the building (IVlobil) on the north west corner of <br />43`d an SR 60? <br />Answer 17. FDOT <br />Question 18. In the plan sheets all of the separators call for color treated/stamped concrete, with <br />that the,SY come up to almost double what the plans call for (575 SY) please advise. <br />Answer 18. Plan quantity for color treated concrete has been verified to be correct. Some of the <br />median islands are color treated concrete, but others are sod. There are designations on <br />each of the islands that show which treatment is to be used and there is a station where <br />the color treated concrete stops and sod begins on medians that have both treatments. <br />Question 19. We are having trouble finding any prestressors to bid this project due to the odd beam <br />design. Can the County provide an alternative to this issue? <br />Answer 19. Bridge to be built per plans and specifications, due to existing conditions and permitting <br />constraints. <br />Attachments: <br />Revised Itemized Bid Schedule <br />Revised Plan Sheets 13, 24 of 99 <br />Color Utility Plan Set <br />Revised Technical Specifications 01025-17 <br />Well Specification 02731 <br />Irrigation Specification 0281 <br />P:\Bids\2018-2019 FY (2019000)\2019073 SR 60 and 43rd Ave Intersection Improvements\Addendum 3\Addendum 3.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.