My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-212B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-212B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 12:17:20 PM
Creation date
1/23/2020 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/17/2019
Control Number
2019-212B
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for SR60 and 43rd Avenue Intersection Improvements
Area
SR60 and 43rd Avenue Intersection
Project Number
Project No: IRC-0853,
Bid Number
BID NO. 219073
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid Number 2019073 <br />Addendum No. 3 <br />i <br />Page 2 of 3 <br />Answer 5. Limited existing topographic information along 43rd Avenue in the area of the retention <br />pond has been added to Sheet 24. The Bidder is cautioned that the use of this information <br />is at their own risk and should be confirmed by the bidder. <br />Question 6. Does temporary lighting have to be provided for this project? <br />Answer 6. Temporary lighting will be dependent on the means and methods selected by the <br />Contractor. If existing lighting is preserved until the proposed final lighting can be installed <br />and activated then temporary lighting will not be required. If lighting is deactivated as a <br />result of Contractor's phasing of work, they will be responsible for ensuring adequate <br />lighting conditions are maintained. <br />Question 7. Are we able to have a lane closure at night and if so, what is the time frame? <br />Answer 7. Lane closures will be granted on a case-by-case basis. If granted, the hours will likely fall <br />between 6:30 PM and 6:30 AM. However, this will be adjusted based on observed traffic <br />conditions. <br />Question 8. The milling quantity in the summary of pay items (2,944 sy) matches the hatched out milling <br />areas in the plans, but what about the overbuild locations on SR 60, it calls out to be milled <br />and resurfaced in the plan sheets, does the overbuild locations on SR 60 get milled? <br />Answer 8. The entire area of existing pavement on SR 60 is to be milled a minimum of 1". Specific <br />areas marked on the plans are to receive milling averaging 2.5". An additional Pay item <br />for 1 -inch of milling has been added to the quantities. <br />Question 9. If the overbuild locations on SR 60 does not get milled what are we supposed to do about <br />the existing thermoplastic on SR 60, the oil and fuel from the cars at SR 60 and 43rd Ave, and <br />the bad existing cracking at the intersection of SR 60 and 43rd Ave? <br />Answer 9. The area of overbuild is to receive a minimum of 1 -inch of milling as stated in the answer <br />to, Question S above. The overbuild quantity estimate reflects the difference from the <br />milled surface to the bottom of the structural course in the overbuild area. <br />Question 10. Does the overbuild locations get the 1.5" of 12.5C (Pay item 0334 1 13A), if so the 12.5C pay <br />item (3,348 tons) would be way understated? <br />Answer 10. The overbuild tonnage includes the 1 %" structural course in the area of the overbuild. <br />Question 1.1. In the typical sections for new construction and widening the plans call for SP -12.5 Traffic C <br />but the pay item is for SP Traffic C, PG 76-22, please advise. <br />Answer 11. Summary of Pay Items has been modified to call for SP -12.5 <br />Question 12. Plan sheets 39 & 40 of 99 indicate that there is milling & resurfacing; however, there is no <br />legend indicating this operation. In addition, the limits of the milling and resurfacing are not <br />cleared, (specifically on the east and west). I performed a take -off in such areas and the <br />milling and resurfacing quantity will substantially exceed the pay item quantity for milling <br />2%" of 2,944 SY? Please clarify. <br />Answer 12. A separate Pay item for milling 1 -inch in all areas of SR 60 has been added to the Summary <br />of Pay Items. The legend for milling and marked areas on Sheets 38 and 41 indicate where <br />milling exceeds the minimum !"and averages 2.5". <br />IRRIGATION QUESTIONS <br />Question 13. Are the sleeves to be open dirt trench? Or are they to be bored? <br />Answer 13. This is to be determined by the Contractors means and methods. Open cut of new sidewalk <br />and pavement will not be permitted. <br />Question 14. The landscape and hardscape overlays are making it difficult to read the irrigation plan. Can <br />we get an irrigation plan with the underlays removed as need so we can perform an . <br />accurate take off? <br />Answer 14. The plans provided are adequate for performing a detailed take -off <br />P:\Bids\2018-2019 FY (2019000)\2019073 SR 60 and 43rd Ave Intersection Improvements\Addend urn 3\Addenda n 3.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.