My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-212B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-212B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 12:17:20 PM
Creation date
1/23/2020 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/17/2019
Control Number
2019-212B
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for SR60 and 43rd Avenue Intersection Improvements
Area
SR60 and 43rd Avenue Intersection
Project Number
Project No: IRC-0853,
Bid Number
BID NO. 219073
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02810 <br />Irrigation <br />1.13 Cleaning Premises: The Contractor shall keep neat and orderly all of the area <br />where this system is being installed. Disposal of rubbish and waste material <br />resulting from the installation shall be continual. Upon completion of the system, <br />the Contractor shall remove from the property, at his own expense, all temporary <br />structures, rubbish, and waste materials resulting from the installation of system. <br />1.12 Submittals: <br />Product Data: The Contractor shall submit technical data and installation <br />instructions for all underground sprinkler system components. Provide <br />component and control system wiring diagrams, seasonal activation and <br />shutdown and manufacturer's parts catalog. Provide these items a minimum <br />of 30 days prior to any work beginning. Also, provide a schedule indicating <br />length of time each valve is required to open to provide a determined <br />amount of water. <br />1.13 Related Work: <br />Lawn and Grasses, section 02400 <br />.2 Trees, plants and Ground Covers,02300 <br />.3 Earth Work, section 02200 <br />.4 Tree Relocation, section 02100 <br />PART 2: PRODUCTS <br />2.01 Materials: Any material specified by name and/or model number in the <br />Specifications or on the irrigation drawings is used for the specific purpose of <br />identifying the materials and insuring the specific use of that material in the <br />construction of the system. No substitutions will be permitted without prior written <br />acceptance from the Landscape Architect. All materials used in the system shall <br />be new and without flaws or defects of any type and shall be the best of their class <br />and kind. All materials shall have a minimum guarantee of one year against <br />material defects or defective workmanship. If the Contractor proposes substitution <br />of material, sufficient descriptive literature and material samples shall be furnished <br />to establish the material as an equivalent substitute. In addition, the Contractor <br />shall state, in writing, the specific reasons for proposing substitute materials. <br />2.02 PVC Pipe and Fittings: <br />All pipes shall be new, free from defects, and continuously marked with <br />identification of the manufacturer, type, class and size. All PVC piping shall <br />be in accordance with ASTM D2241. <br />2 All main lines shall be schedule 40 type 1120-1220- polyvinyl chloride <br />(PVC) piping and shall conform to CS -256-63. All lateral pipes shall be <br />schedule 40 solvent weld conforming to ASTM D-1784 and D-2241. All <br />02810-3 <br />Irrigation <br />State Road 60 and 43rd Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.