My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-212B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-212B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 12:17:20 PM
Creation date
1/23/2020 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/17/2019
Control Number
2019-212B
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for SR60 and 43rd Avenue Intersection Improvements
Area
SR60 and 43rd Avenue Intersection
Project Number
Project No: IRC-0853,
Bid Number
BID NO. 219073
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02810 <br />Irrigation <br />3 Verification of wire types, sizes and installations procedures shall be <br />checked to conform to local codes. <br />4 All sleeves for control wiring shall be a Schedule 40 gray electrical PVC <br />pipe. <br />2.06 Lightning Protection: Lightning protection shall be installed in accordance with <br />Manufacturer's recommendations to protect the automatic controller. <br />2.07 Pump Stations: Pre -fabricated pimp stations and wells shall be installed per the <br />irrigation plan pump station details, notes and written Well Specifications Section <br />02731. Power to the pump stations shall be determined and coordinated. The <br />electrical service, disconnect and all equipment shall be installed by a licensed <br />electrician to code. <br />2.08 Automatic Controllers: <br />The controller shall be Hunter I -CORE IC -1201-M. The controllers shall <br />each have 12 stations, metal cabinet and a Hunter "Solar -Sync" <br />combination ET sensor and rain sensor installed on the pump station. <br />2 Controller Housing: Weatherproof, watertight with stainless steel hinge latch <br />to accept padlocks or a lockable access door. <br />2.09 Remote Control Valves and Valve Boxes: <br />Valves — Hunter ICV Filter Sentry Series remote zone control valves, or <br />approved equal. See plans for sizes. <br />2 Valve Boxes - Each valve will be individually sleeved in a covered valve <br />box. Valve boxes will be 12" rectangular box with lid as manufactured by <br />Ametek model #170106. <br />PART 3: EXECUTION <br />3.01 Installation: <br />All materials and equipment shall be installed in a neat and workmanlike <br />manner following the recommendations of the manufacturers of the <br />materials. The Landscape Architect retains the right to order removal or <br />replacement of any items, which, in his opinion, do not present a <br />reasonably neat and workmanlike appearance. Any required removal and <br />replacing of materials shall be performed and completed without additional <br />expense to the Owner. <br />2 Installers shall be companies specializing in the work of this section with a <br />minimum of 3 years experience. <br />02810-5 <br />Irrigation <br />State Road 60 and 43rd Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.