My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-212B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-212B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 12:17:20 PM
Creation date
1/23/2020 11:53:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/17/2019
Control Number
2019-212B
Agenda Item Number
12.F.1.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for SR60 and 43rd Avenue Intersection Improvements
Area
SR60 and 43rd Avenue Intersection
Project Number
Project No: IRC-0853,
Bid Number
BID NO. 219073
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02810 <br />Irrigation <br />3.12 Sprinkler Heads: <br />All rotor heads shall be installed on swing joints as shown on Drawings. <br />The sprinkler head shall be installed so that the top is in accordance with <br />the manufacturer's recommendations with respect to the finished grade <br />level, and marked with a flag to assist in preventing damage to sprinkler <br />heads. Backfill around swing joints and sprinklers shall be clean sand fill <br />materials, free of large rocks, organics, or other foreign debris (see detail <br />on the plans). <br />2 All sprinkler heads shall be located a minimum of 8" away from the edge of <br />any bed line, curb, roadway, or sidewalk, and a minimum of 12" away from <br />any building. <br />3 All bubblers that are shown on the plans shall be installed immediately <br />adjacent to the ball of the tree to be irrigated. If the tree is located on a <br />slope, the bubbler should be located at the tree ball near the high side of <br />the slope. <br />4 If required, provide additional compactible soils as required to stabilize soil <br />in area of sprinkler heads. <br />5 The design location of irrigation heads is approximate. The Contractor shall <br />make minor adjustments as necessary to avoid plantings and other <br />obstructions. Layout may be modified, if necessary to obtain coverage, to <br />suit manufacturer's heads, and with the written approval of the Landscape <br />Architect. Do not decrease the number of heads indicated unless otherwise <br />acceptable to the Landscape Architect. <br />6 The Contractor shall add extension risers to all 12" pop-up pistons so that, <br />while operating, the nozzle is a minimum of 3" above the top of the adjacent <br />plant material. <br />3.12 Valve Boxes and Markers: All valve boxes or any other miscellaneous marker or <br />access box shall be installed so the top of said structure is at finished grade. <br />Valve boxes shall be installed as noted on the Drawings. All groups of valve <br />boxes shall be installed so that the tops of all boxes are level with each other, <br />and the sides of all boxes are parallel to each other. <br />3.12 Electric Control Lines: <br />All electric control wire shall be sized as previously stated. It shall be <br />installed in the piping trenches wherever possible and be placed under the <br />PVC piping. Control wires shall be taped together with electrical tape not <br />more than 5" O.C. Wire shall be snaked into the trench as loose as <br />possible and with as much slack as possible to allow for the expansion and <br />contraction of the wire. Provide a 10" expansion coil at 100' intervals along <br />02810-8 <br />Irrigation <br />State Road 60 and 43rd Avenue <br />
The URL can be used to link to this page
Your browser does not support the video tag.