Laserfiche WebLink
Page 3 of 5 <br />OTHER ISSUES <br />• Testing per- FDOT specifications. (Andersen Andre Consulting Engineers, Inc. through <br />Consor Engineers, LLC). <br />• Review and comment with questions and clarifications as soon as possible, no further <br />comments 10 days prior to bid opening (Monday, October 6, 2019). <br />• Maintenance of Traffic: <br />o Contractor shall submit a Maintenance of Traffic Plan to the Indian River County, <br />Engineering Division for approval. <br />o Traffic shall be maintained at all times. <br />o Access for school, businesses and residences shall be maintained at all times. <br />Any agreement made between the Contractor and any land owner for use of <br />property or access control must be in writing and copy given to the County. <br />o School buses, sanitation & US Postal Service must be maintained. <br />o The Maintenance of Traffic Plan shall meet the FDOT Index 600, FY2017-2018 <br />Edition and shall be signed and sealed by a Florida PE. <br />o Detour routes must be developed and signed by a Florida Professional Engineer <br />and approved by the County. <br />• Indian River Farms Water Control District permits 17-14 and 17-15. <br />• The successful Bidder shall provide all As -Built requirements to their Land Surveyor prior <br />to submitting drawings to the County for approval. <br />• Addendums if required — Bidders to review plan docs and provide comments to <br />Purchasing as soon as possible and within 5 business days following receipt of Pre -Bid <br />Meeting minutes. No further comments or questions 10 days prior to bid opening. <br />DISCUSSION <br />Questions & Answers <br />• Diego Velasquez FDOT —This is a CIGP 50/50 grant funded project. FDOT will be <br />providing oversite. Requires QC and VT testing. FDOT specs MUST be met. <br />Certifications for the drill shafts and all bridge work. Work will be verified by FDOT <br />Structures Inspectors. <br />• James Ennis — The following meetings will be required; Pre -Drill shaft, Pre -Deck <br />placement, and Pre -paving. QC plans will be required per FDOT specifications, etc. All <br />material must be from the FDOT approved products list. <br />• Shop drawings shall be provided in advance of work being performed to provide ample <br />time for review, as set forth in the specifications. <br />• Maintenance of Traffic plan should be one of the first submittals by the Contractor. <br />All work being performed with the IRFWCD Canal shall be coordinated with David <br />Gunter, Superintendent of the Water Control District. <br />• David Gunter, Indian River Farms Water Control District — Noted in order to meet <br />turbidity requirements, pilings and concrete sheeting must be driven and not jetted. <br />Excavation of the canal will be permitted with prior proper approval. The canal flow <br />can be stopped for short periods of time during the dry season if necessary. <br />F:\Public Works\LNGINELRING DIVISION PROJLCI`S\08 3 -43rd AVI; 18th ST to 26th ST' (Arcadis) 1-Admin\Bid <br />DOCUnlents\AddendlltllS\Addendum 2\0853_PreBid.Meetin.g_Minutes _201.90918. doe <br />