Laserfiche WebLink
Page 5 of 5 <br />have to be submitted prior to any testing or field investigation. If going into the canal area <br />bidders shall contact IRFWCD to let them know. <br />Question: On Sheet 20 of 58 what do the hatch patterns signify throughout the plans? <br />Answer: The legend is located on Sheet 38 of 99 of the Roadway Plan sheets. <br />Question: Is there a Utility relocate schedule that is attached to this project? <br />Answer: The utility matrix is located on sheets 27A through 27D of 99 in the plan set, all <br />current Utility Work Schedules will be provided in Addendum. <br />Question Part -one: Lighting, the load centers are outside DOT standards by being pole <br />mounted? <br />Answer: They are on 43rd Ave. and do not have to meet FDOT standards. <br />Question Part Two: You are going to put them on a ten -foot pole and insist on the meter being <br />mounted at 5 feet? <br />Answer: This is to be bid as shown. <br />Question: The Engineer of Record is specifying Miami -Dade APL distribution center which is <br />molded, mg squared and very expensive. This brand is not the only one on the FDOT APL. <br />Answer: These items are to bid as specified. Approved equal will be considered. <br />Meeting Adjourned. <br />F:\Public Works\GNGINETRING DIVISION PROI73CI'S\0853-43rd AVB 18th S'T to 26th ST (Arcadis)\I-Admin\Bid <br />Documents\Addendimis\Addendum 2\0853_PreBidMeeting Minutes_201.9091.8.doe <br />