My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-013
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:19:11 PM
Creation date
1/27/2020 2:03:58 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/21/2020
Control Number
2020-013
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
CCNA2018 Amendment 1 to Work Order Number 3 for professional consulting services
associated with Phase I of the Former Gifford Road Landfill
Area
Former Gifford Road Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntecd <br />consultants <br />Mr. Himanshu H. Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />1325 74th Avenue SW <br />Vero Beach, Florida 32968 <br />Subject: Amendment to Work Order Number 3 <br />Former South Gifford Road Landfill <br />Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />6770 South Washington Avenue, Suite 3 <br />Titusville, Florida 32780 <br />PH 321.269.8550 <br />www.geosyntec.coin <br />19 December 2019 <br />Geosyntec Consultants (Geosyntec) is pleased to submit this amendment to the Indian River County (IRC) <br />Solid Waste Disposal District (SWDD) to provide additional consulting services associated with Phase 1 <br />of the Redevelopment Plan for the Former Gifford Road Landfill, located in Vero Beach, Indian River <br />County, Florida (Site). Phase 1 consists of surficial land clearing of approximately 8 -acres of land, <br />including 3 -acres at the north end of the Site that will serve as the Site frontage, and 5 -acres in the central <br />portion of the Site that will serve as an open field. Locations of these areas are shown on Figure 1. <br />Additionally, Phase 1 includes landscaping along the 41 st Street frontage and installation of an associated <br />irrigation system. As you are aware, the conceptual design for the Redevelopment Plan for the Former <br />South Gifford Road Landfill, including Phase 1, was prepared as part of the brownfields grant -related <br />planning activities conducted by the Treasure Coast Regional Planning Committee (TCRPC). The first <br />step in implementing Phase 1 is to finalize the design and create a formal bid specification for <br />subcontractors. Work Order Number 3 was issued to address this scope of work. A pre -application <br />meeting was held with the County on 27 August 2019 to discuss the initial design. The County provided <br />written comments on 27 August 2019 documenting the discussion from the meeting. This amendment is <br />submitted to address the comments in the 27 August 2019 comment letter. <br />The remainder of this proposal provides an overview of the project background, a description of the <br />proposed scope of work, a budget estimate, and a discussion of the schedule for accomplishment of the <br />work described herein. <br />PROPOSED SCOPE OF WORK <br />This proposed scope of work consists of finalization of the conceptual design for Phase 1 (implementing <br />the comments from the IRC), and the completion of a formal bid specification associated with Phase 1 of <br />the redevelopment activities. For the purpose of budgeting, the scope of work has been divided into the <br />following tasks: <br />0 Task 1 — Project Management <br />• Task 2 — Finalize Conceptual Design <br />FR0766\XR 18011 _Change Order Gifford_F <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.